Getting Into Aljada for AED 728,000 with 5% Down
ARADA's Nasaq Phase 6 is a residential apartment complex in Aljada, Sharjah. Construction started in April 2022, and expected completion was December 2024. That date has passed, placing this among projects where handover is imminent or already complete.
The standout entry figure is the 5% down payment. Buyers secure a unit with approximately AED 36,400. The remaining 60% falls due at handover, which is the near-term financial event here.
Aljada, Sharjah: What the Location Delivers
Aljada is a master-planned community in Sharjah. Nasaq 6 is one of its sub-communities, placing this project within an organised residential neighbourhood rather than a standalone building on undeveloped ground. Sharjah sits adjacent to Dubai, which matters for any buyer or tenant who works or studies across the border. The sub-community structure places this project within the broader Aljada master plan.
What AED 728,000 Gets You
The listed price is AED 728,000. Unit size data places this at the 1-bedroom level: 1-bedrooms run from 672 to 798 sq ft across the project, while 2-bedrooms span 1,169 to 1,396 sq ft and 3-bedrooms reach 1,743 to 1,759 sq ft. A buyer at 728K is entering at the 1-bedroom bracket.
At this price in a master-planned Sharjah community, the project sits in mid-market territory. It is accessible to first-time buyers and to investors.
Apartments for 1, 2, and 3 Bedrooms
The project offers 1-bedroom, 2-bedroom, and 3-bedroom apartments. One-bedrooms come in 12 distinct layout types with over 100 sq ft of size variation between the smallest and largest. That range gives buyers a genuine choice between compact and more spacious 1-bedroom layouts.
Two-bedrooms cover six configurations from 1,169 to 1,396 sq ft, a spread of over 200 sq ft. A family comparing options within this bedroom count has real variation to evaluate. The 3-bedroom units, at 1,743 and 1,759 sq ft, suit households that want apartment living at a scale closer to a mid-size home.
Getting In for 5%
| Payment Phase | Amount Due |
|---|---|
| Down payment | 5% |
| During construction | 35% |
| At handover | 60% |
5% down means a buyer commits AED 36,400 at signing. Construction instalments follow across the build period. With December 2024 already passed, those instalments are complete.
The key figure now is the 60% at handover. A buyer needs this funded through a mortgage or existing capital before keys are handed over. There is no post-handover payment option, so the 60% is due in full at delivery.
Fitness, Dining, and Poolside
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Health Club |
| Swimming | Infinity Pool, Shared Pool |
| Dining | Cafe and Restaurants, Restaurants |
| Parking | Covered Parking |
Two pools cover different uses: the infinity pool for leisure, the shared pool for day-to-day swimming. A health club alongside a gymnasium signals a fitness offering that goes beyond a standard equipment room. On-site dining at both cafe and restaurant level gives residents daily food options without leaving the project.
The amenity set targets residents who want self-contained daily living. Fitness, dining, and covered parking cover the practical requirements. The two-pool arrangement adds leisure variety within the project, with the infinity pool functioning as the architectural feature and the shared pool handling everyday use.
Where the Timeline Stands
Construction began in April 2022, with completion set for December 2024. That date has now passed. This is a near-delivered or already-delivered project, not an early off-plan commitment. The handover payment is the near-term financial event; the risk of construction delay sits behind this purchase rather than ahead of it.




