Sokoon Phase 5 by Arada: Apartments at AED 836,000 in Aljada, Sharjah
Sokoon Phase 5 is an apartment project by ARADA inside the Naseej District of Aljada, Sharjah. It is the fifth phase in the Sokoon sub-community, part of a broader residential buildout within the Aljada masterplan. Multiple earlier phases have been completed before this one, and the scheduled completion date has passed, making this a finished or near-finished product rather than a long-horizon off-plan commitment.
Aljada and the Sharjah-Dubai Corridor
Aljada sits on Emirates Road in eastern Sharjah, on a primary route connecting the emirate to Dubai. The Dubai border at Al Nahda is roughly 15 to 20 minutes by car, putting Dubai International Airport within about 25 minutes and central business districts in Business Bay or DIFC within 35 to 45 minutes under typical morning traffic.
For buyers weighing this location, Sharjah's appeal relative to Dubai lies in unit size and price efficiency. Naseej District is a quieter residential sub-zone within Aljada with green corridors and a neighbourhood feel distinct from central Sharjah or central Dubai. The area suits buyers working inside Sharjah or commuting to Dubai by car during off-peak hours. There is no metro connectivity from this part of Sharjah, so a car is required for most daily trips.
One Price: AED 836,000
This phase carries a single price point: AED 836,000 per apartment. There is no range. Every unit in this release is priced identically, which means the decision is straightforward: this figure either fits the budget or it does not.
At this price, buyers are entering a delivered project in an active masterplan. Earlier Sokoon phases by ARADA are available to view, so buyers can assess finished units in the cluster rather than relying on floor plan drawings alone.
Apartments in a Masterplan Setting
All units in Sokoon Phase 5 are apartments. The project targets single professionals, couples, or small families looking for apartment living in a managed community. Buyers seeking villas, townhouses, or other formats would need to look at other phases within the Aljada area.
Amenities
| Category | Features |
|---|---|
| Outdoor & Social | Landscaped Gardens, Barbecue Area |
| Fitness | Health Club |
| Technology | Smart home |
The offering covers four amenities. A health club addresses the daily fitness use case. Landscaped gardens and a barbecue area serve outdoor living and social gatherings. Smart home technology is integrated at the unit level, not a shared communal facility, which keeps service charge exposure limited.
This is a functional amenity set aimed at residents who want liveable basics rather than a resort profile. The target resident uses the gym most days, values managed green space, and does not need an on-site pool or clubhouse. Buyers expecting a broader leisure offering would need a different project.
Timeline: Likely Delivered
Construction on Sokoon Phase 5 began in April 2024 and was scheduled for completion by December 2024. That date has passed. The project is most likely already handed over or very close to it. Buyers entering now are purchasing a completed or near-completed apartment rather than waiting on a build. Construction delivery risk does not factor into this decision.
Getting In for 5% Down
| Stage | Payment |
|---|---|
| Down payment | 5% |
| During construction | 40% |
| On handover | 55% |
The down payment is 5%, which comes to approximately AED 41,800 on a unit priced at AED 836,000. That entry is low relative to the total purchase price, and it limits the cash required to secure the purchase. This is a meaningful advantage for buyers who want to minimise capital tied up at the point of signing.
The payment structure places 55% at handover, and with the project past its completion date, that tranche is due soon, not in 18 months. There is no post-handover plan. The balance settles at keys. Buyers need financing or cash ready before signing. This structure suits buyers who are already prepared to close, not those planning to fund the balance over several years.



