Haus 99 Residences, Jumeirah Village Triangle
Hausen Developments is delivering Haus 99 Residences in Jumeirah Village Triangle, a residential community positioned in central Dubai between two of the city's main arterial highways. Construction starts in late 2026, with handover targeted for December 2028.
A Central Dubai Address with Strong Road Access
Jumeirah Village Triangle sits between Sheikh Mohammed Bin Zayed Road and Al Khail Road, two of Dubai's primary arterial highways. Dubai Marina is roughly 15 minutes from the community. Downtown Dubai is around 25 minutes, and the airport within 30 minutes in normal traffic. The triangle's layout keeps most through-traffic away from its internal roads, giving residents access to the wider city without living on a main artery. It is not a waterfront or downtown address, but for buyers prioritising highway access over central proximity, the positioning here is efficient.
AED 610K to AED 3.57M: What the Spread Means
The range is wide, and it reflects two fundamentally different product types. Apartments anchor the lower end, starting at AED 610,000. That entry point suits investors working with limited equity and first-home buyers entering the Dubai market. At the top, townhouses drive the ceiling to AED 3,570,000, placing them in the mid-market family home bracket.
The spread is not a listing quirk. Someone at AED 610K is looking at a compact apartment. Someone at AED 3.57M is looking at a multi-bedroom townhouse with private outdoor space. The two products sit inside the same development but serve entirely different buyer profiles.
Apartments and Townhouses
Haus 99 Residences offers two residential formats. Apartments suit investors targeting yield and a lower entry price, or buyers who want a Dubai address within a tighter budget. Townhouses are built for families who want space, a private entrance, and outdoor living inside a managed community. The mix of both types within one project gives buyers at either end of the price range a choice without looking across different developments.
What the Amenity Set Says About This Project
| Category | Amenities |
|---|---|
| Fitness & Leisure | Indoor Swimming Pool, Gymnasium |
| Outdoor & Green | Landscaped Gardens, Children's Play Area |
| Dining | Restaurants |
| Security | CCTV Security |
Six amenities is a lean total, but the choices are coherent and tell a clear story about the target resident. The indoor pool carries genuine year-round relevance in Dubai's climate, where heat makes outdoor water facilities impractical for extended stretches of the summer. The on-site restaurants point to a developer expecting residents to treat this as a settled home rather than a transit address. The children's play area and landscaped gardens reinforce the family orientation visible across both the apartment and townhouse formats.
Completion December 2028
Construction starts in late 2026 and completes in December 2028. Buyers entering now have roughly two years until handover. For an off-plan purchaser, the timeline is defined clearly enough to plan around. End-users can expect to move in around early 2029.
30% During Build, 70% at Handover
| Stage | Payment |
|---|---|
| During construction | 30% |
| Handover | 70% |
The 30/70 structure keeps the construction-phase commitment to one third of the purchase price, spread across the entire build period rather than loaded at the front. The remaining 70% falls due at handover in December 2028, making that date the defining financial event in the purchase timeline. For cash buyers, this is one large payment at completion. Buyers financing through a mortgage are working toward a fixed event in December 2028. The back-loaded structure means most of the purchase cost arrives in a lump sum at handover.










