Pearl House by Imtiaz: Studios and One-Bedrooms in the Heart of JVC
Pearl House is a residential apartment building developed by Imtiaz Developments in Jumeirah Village Circle, one of Dubai's most active mid-market communities. The project sits within District 13, a well-established pocket of JVC that offers good road access and a range of everyday amenities within walking distance.
JVC District 13: What the Location Actually Means
Jumeirah Village Circle sits at the geographic centre of Dubai's residential belt. District 13 is close to Al Khail Road, putting you within 20 minutes of Business Bay and roughly 25 minutes from Dubai Marina during off-peak hours. The community has its own retail strip, schools, and clinics, so residents manage most daily errands without leaving the neighbourhood.
The village-style layout also means smaller streets, landscaped parks, and a lower-rise character that stands apart from the tower clusters elsewhere in new Dubai. JVC's central position makes it practical for people who commute in multiple directions. For investors, that broad commuter reach translates into a tenant pool drawn from across the employment hubs surrounding the interchange. For owner-occupiers, the draw is space, affordability, and a quieter residential feel compared to higher-density corridors like Downtown or the Marina.
What AED 587K to AED 872K Buys You Here
The price range runs from AED 586,771 to AED 871,788, spanning two distinct unit types. Studios start at the lower end; one-bedrooms top out at the higher figure.
The studio buyer here is typically an investor or a single professional looking for a compact, low-entry-cost apartment. At under AED 590K, it represents a manageable ticket size for first-time buyers and fits within the mid-market segment for JVC.
The one-bedroom at AED 871,788 targets a different profile: couples, remote workers who need a dedicated workspace, or investors who want a larger unit to attract a different tenant pool. The gap between the two is around AED 285,000, which reflects the meaningful difference in floor area and configuration, not just bedroom count.
The Amenity Set and What It Signals
| Category | Facilities |
|---|---|
| Wellness | Well-being and Fitness, Gymnasium, Shared Spa |
| Outdoor | Private Garden, Barbecue Area |
| Lifestyle | Cafe and Restaurants |
The shared spa adds a wellness dimension that goes beyond a standard gym-only offering. The private garden and barbecue area give residents outdoor communal space, which is practical for a building where individual balconies may be compact. The in-building cafe or restaurant component supports everyday living and could strengthen rental appeal for tenants who value on-site options.
Taken together, the amenity set targets residents who use their building's common areas as part of their daily routine. The combination of spa access, outdoor space, and food and drink on-site is a deliberate pitch at buyers and tenants who want more than the minimum.
Construction Timeline
Construction broke ground in May 2023. The scheduled completion date was September 2025, which has now passed. Pearl House has completed its construction phase. For a buyer evaluating this project now, that status matters: the build-period risk is gone, and the assessment shifts to the delivered product and current pricing rather than projected timelines.
Getting In for 20%
| Stage | Percentage |
|---|---|
| Down payment | 20% |
| During construction | 40% |
| Handover | 40% |
The 20% down payment is standard for Dubai off-plan and doesn't represent a particularly low barrier to entry. The 40/40 split between construction and handover spread payments across the build period. Since the project has completed, buyers entering at this stage are transacting on ready-unit terms rather than the original off-plan structure.
There is no post-handover instalment plan. The full balance was due at handover, so buyers who entered during the off-plan phase needed their financing in place before keys were issued.










