Lincoln Star Residence 5, Dubai South
Lincoln Star Residence 5 is a residential apartment development by Lincoln Star Real Estate Development, located in the Residential District of Dubai South (Dubai World Central). This is the fifth release in the developer's Lincoln Star series within the same master community.
What Dubai South Means in Practice
Dubai South is a planned district built around Al Maktoum International Airport. When the airport reaches its projected capacity, this location will sit at the convergence of one of the world's major aviation and logistics hubs. For buyers today, that long-term trajectory is the core investment argument.
The area sits roughly 35 to 40 minutes from Downtown Dubai under normal traffic. Expo City Dubai, the redeveloped Expo 2020 site, is nearby and operates as a mixed-use district with offices, events, and retail. The Residential District is a purpose-built neighborhood for people who want to live near the logistics and aviation corridors without paying the prices of more central Dubai addresses.
For end-users, that means a quieter, lower-density environment in a district still actively being built out. For investors, it means a district where growth is tied to long-term government infrastructure investment rather than short-term sentiment.
What AED 576K to AED 1.4M Gets You Here
The price range runs from AED 576,000 to AED 1,400,000. That is a wide spread for a single building type, and it reflects the range of configurations across the development.
At the lower end, compact studios or one-bedroom units aimed at first-time buyers and investors represent the entry point. At AED 1.4 million, the buyer is likely targeting a larger two-bedroom or a premium unit on a higher floor with better views. The spread tells you this project serves more than one buyer profile under the same roof.
The entry price of AED 576K sits at an accessible level for Dubai South, consistent with the district's positioning as a value-for-space alternative to more central Dubai addresses.
Apartments Across the Range
All units are apartments. The wide price band points to multiple configurations. Entry-level units suit investors seeking rental yield at a lower ticket price. Larger units suit buyers who want family-sized space and find their budget goes further here than in more established parts of the city.
What the Amenity Set Says About the Project
| Theme | Facilities |
|---|---|
| Wellness & Fitness | Indoor Swimming Pool, Gymnasium |
| Security | CCTV Security |
| Dining & Social | Restaurants, Barbecue Area |
| Family | Children's Play Area |
The indoor pool is the standout item. It extends usability through Dubai's summer months, when an outdoor pool becomes less practical. The on-site restaurant keeps a daily convenience inside the building rather than requiring residents to go out. The barbecue area and children's play zone signal a project targeting families and long-term residents rather than transient occupiers.
Six amenities total. The combination covers core daily needs for a primary residence.
Getting In Before May 2029
Construction started in October 2026. Completion is scheduled for May 2029. Off-plan buyers entering now have roughly two and a half years before handover.
The down payment and construction-phase instalments spread across that window. The largest payment falls at handover, so the earlier stages carry the lighter financial commitment.
Getting In for 20%
| Stage | Payment |
|---|---|
| Down payment | 20% |
| During construction | 30% |
| On handover | 50% |
The 20% down payment opens the purchase, with 30% distributed across the construction period. Half the total price falls at handover, which is where the largest cash commitment lands.
There is no post-handover instalment plan. The full price clears at or before handover. Buyers using a mortgage need their financing confirmed before the handover date. Cash buyers face a straightforward three-stage schedule.
















