Arabian Gate Phase 2: Apartments from AED 396K in Dubai Land
Time Properties developed Arabian Gate Phase 2 as a residential apartment project within Dubai Land, one of Dubai's larger master-planned districts. Construction on this phase began in November 2018, extending a project line aimed at buyers who want apartment living at a mid-market entry point.
Dubai Land: What the Location Delivers
Dubai Land sits off Emirates Road (E611) with connections to Sheikh Mohammed Bin Zayed Road. Residents are roughly a 20 to 30 minute drive from Downtown Dubai and have direct road access to Global Village, Dubai Outlet Mall, and Academic City. For a working professional who drives, the location is functional.
The area is still developing. Retail and service options within the district are thinner than in more established parts of the city. That is a live consideration for anyone planning day-to-day life around local amenities rather than a car. For investors, the lower price points in Dubai Land reflect that development stage and represent a different kind of entry compared to more central districts.
AED 396K to AED 650K: Reading the Spread
The price range runs from AED 396,216 to AED 650,384, a gap of roughly AED 254,000. Within an apartment-only project, a spread of this size typically reflects differences in unit floor area and configuration rather than floor level alone. The entry point below AED 400K is accessible by Dubai standards for a new-build with this amenity count. The top of the range at AED 650,384 stays mid-market throughout.
A buyer at the lower end is getting into Dubai's property market at a price point that is hard to find in new-build apartments with a comparable shared facility offering. The upper end suits buyers who want more space within the same community without paying a premium-district rate.
Who This Project Fits
The project is apartments only, which simplifies the decision for buyers who have already settled on apartment living. Two types of buyers make sense here: end-users who want a managed community with a strong shared amenity set and are comfortable commuting by car; and investors seeking a lower-cost Dubai residential entry with a completed building rather than a development in progress.
Amenities Built Around Residents Who Stay In
| Category | Facilities |
|---|---|
| Wellness & Fitness | Gymnasium, Shared Spa, Well-being and Fitness Centre, Infinity Pool, Shared Pool |
| Recreation | Barbecue Area, Children's Play Area, Cycle Track, Restaurants |
| Community | Mosque, Beach Access |
| Building | High Speed Elevators, Security |
Beach access is the item that needs context. Dubai Land is an inland district. The listing most likely refers to a lagoon or man-made water feature within the development rather than coastal access.
The overall set of 13 amenities points to a project built for residents who spend real time at home. Dual pool options, a spa, a gym, and a cycle track go beyond what most mid-market projects at this price level offer. The children's play area and barbecue area reinforce a family orientation. The amenity depth here competes with projects priced noticeably higher.
The Building Is Past Its Handover Date
Construction began in November 2018 with an expected completion of April 2023. That date is more than three years in the past. Arabian Gate Phase 2 is beyond its scheduled handover window. This is a completed building, not an active construction site.
For buyers entering now, that changes the conversation significantly. You are not acquiring off-plan. You are looking at a finished project where delivery quality, communal area condition, and actual occupancy rates can be observed directly rather than inferred from a brochure. For investors, rental income potential is live and trackable, not projected.



