Vega Residence, Dubai Sports City: Apartments from AED 719K
Vega Residence is a residential apartment development by Acube Developers in Dubai Sports City. Construction began in January 2025, with handover scheduled for May 2027. The project spans a full unit range from studios through three-bedrooms, priced from AED 719,000 to AED 2,345,845.
Living in Dubai Sports City
Dubai Sports City sits in the southwestern part of Dubai, roughly 25 to 30 minutes from Downtown Dubai and about 20 minutes from Dubai Marina. The area includes a cricket stadium and a golf course, and borders Motor City and Jumeirah Village Circle to the north. Sheikh Mohammed Bin Zayed Road connects the district to central Dubai and south toward Al Maktoum International Airport, a roughly 20-minute drive from the development.
The character is quieter and lower-density than central parts of the city. Most daily errands require a car, and the distance from the main business corridors is a real factor for buyers who commute to Downtown, DIFC, or Business Bay daily. For buyers who work remotely or spend time along the Sheikh Mohammed Bin Zayed corridor, the longer drive to central hubs becomes less of an issue. For investors, the location and unit mix point toward long-stay residential demand rather than short-stay turnover.
What the AED 719K to AED 2.35M Range Actually Means
The gap of more than AED 1.6 million between floor and ceiling reflects a genuinely wide unit mix. Studios at 412 to 486 sq ft start at AED 719,000, the entry point of the project. One-bedrooms at 746 sq ft are available from AED 1,196,220 across several layout variants. Two-bedrooms run from 1,073 to 1,206 sq ft depending on layout, starting at AED 1,608,374. The three-bedroom at 1,488 sq ft begins at AED 2,345,845.
Studio and one-bedroom units target yield-focused investors looking for rental efficiency and a lower capital commitment. Two- and three-bedroom units suit buyers looking for more floor area, whether for family occupancy or a longer-term residential hold.
All Apartments, Multiple Layouts per Tier
All units are apartments. Multiple layout variants exist within the one-bedroom and two-bedroom configurations, giving buyers some flexibility in selecting floor position and unit orientation beyond just bedroom count.
What Seven Amenities Say About This Project
| Category | Facilities |
|---|---|
| Wellness | Gymnasium, Indoor Swimming Pool |
| Outdoor | Landscaped Gardens, Barbecue Area |
| Dining | Restaurants |
| Family | Children's Play Area |
| Security | CCTV Security |
Seven amenities is a focused list, but the mix is practical. An indoor pool is the most usable wellness feature in Dubai's climate: outdoor pools are unusable for several months of the year. The barbecue area and children's play area together indicate the project is aimed at families and longer-stay residents rather than a transient rental profile. On-site dining reduces dependence on driving for meals, a genuine convenience in a district where walkable options are limited.
Handover Targeted for May 2027
Construction started in January 2025, with completion targeted for May 2027. That is a 28-month build programme. Booking opened the month construction began, so the project has been actively selling and building in parallel since early 2025. A buyer entering now is roughly two years from receiving keys.
60/40: Full Commitment at Handover
| Phase | Percentage |
|---|---|
| During construction | 60% |
| At handover | 40% |
Sixty percent is paid in staged instalments during the construction period. The remaining 40% is due at handover. There are no post-handover instalments. The full purchase price is settled at key collection, with nothing deferred beyond that date.









