The Gate Phase 2: Apartments in Sharjah's Aljada
ARADA builds The Gate Phase 2 within Aljada, a master community in central Sharjah. The Gate is a residential cluster within that community, and Phase 2 extends the apartment offering across the same district. The building sits inside a larger planned environment, which gives buyers access to community-level infrastructure alongside the building's own amenities.
Sharjah's Interior: The Aljada Position
Aljada sits in central Sharjah with access to Emirates Road (E611) and Sheikh Mohammed Bin Zayed Road (E311), the two main arteries between Sharjah and Dubai. The Sharjah-Dubai corridor carries heavy peak-hour traffic, and commute times to central Dubai during rush hour can run long. Residents who work within Sharjah or remotely feel that pressure less. Aljada's master plan includes internal facilities, reducing how often residents need to travel outside the district for daily needs.
Sharjah entry prices are lower than equivalent addresses in Dubai. That gap makes Aljada relevant for buyers who want a managed community setting at a lower price point than Dubai currently allows.
What AED 772K to AED 1.77M Gets You
Apartments at The Gate Phase 2 are priced from AED 772,000 to AED 1,777,000. The roughly AED 1 million spread across the range reflects differences in unit size and floor level. Compact units on lower floors sit near the base; larger or higher-floor units push toward the ceiling. The project serves buyers entering at a moderate budget and those looking for a more spacious unit within the same community.
One Format: Apartments Throughout
Every unit at The Gate Phase 2 is an apartment. That suits end users who prefer managed building infrastructure and investors who want units ready to lease without additional fit-out cost.
Eight Amenities, Family-Focused
| Category | Facilities |
|---|---|
| Recreation | Shared Pool, Shared Gym, Children's Play Area |
| Convenience | Covered Parking, Balcony, Built-in Wardrobes |
| Building Services | Elegant Lobby, Security |
The children's play area points squarely at family households as the primary audience. Built-in wardrobes and balconies in every unit remove the main barriers to renting out a unit immediately after purchase. The shared pool and gym keep the building competitive in the leasing market without the service charges that come with private or hotel-style amenities.
Built in 2024, Likely Already Complete
Construction on The Gate Phase 2 began in April 2024, with a scheduled completion of September 2024. That date is now over two years in the past. The project has almost certainly been completed and units handed over. A buyer entering now is not acquiring an off-plan commitment; they are looking at a finished building.
Entry for 5% Down
| Stage | Percentage |
|---|---|
| Down Payment | 5% |
| During Construction | 40% |
| At Handover | 55% |
The 5% down payment keeps the initial outlay small. The balance structure runs through to handover, with 55% falling due at keys. On an AED 1 million unit, that is AED 550,000 payable at a single event. The schedule ends at handover with no installments extending beyond it. For a buyer entering what appears to be an already-complete project, that large payment falls in the near term rather than at a future construction milestone.















