Azizi Venice 2: Studio Entry at AED 670,000 in Dubai South
Azizi Developments built Azizi Venice 2 as an apartment project within its larger Venice master community in Dubai South. It offers studios, one-bedrooms, and two-bedrooms. The 10% down payment is the first thing to understand about this project. The rest of the payment structure sits at 30% during construction and 60% at handover. That split matters because handover has likely arrived.
Dubai South and What It Means
Dubai South, also known as Dubai World Central, is a planned district built around Al Maktoum International Airport, roughly 35 kilometres from Downtown Dubai. The drive to Downtown takes around 40 minutes. The Expo City district, which emerged from the Expo 2020 site, borders this area and has added residential density to the southern corridor.
The investment case in Dubai South is long-term. Infrastructure is in place, the airport is operational, but the district sits earlier on the maturity curve than many established residential zones in the city. Buyers here are typically backing the continued build-out of the area over the coming years.
Azizi Venice 2 sits within the wider Azizi Venice community, which gives it a master-plan context and shared environment rather than a standalone building position.
Studios from AED 670,000
The listed entry price is AED 670,000, which covers studios in the project. Studio units run from 333 to 387 sq ft across four layout types. One-bedroom apartments span 624 to 679 sq ft, also in multiple layouts. The two-bedroom option reaches 1,249 sq ft.
Studios at this price in Dubai South target two distinct buyers: single residents who want an airport-adjacent base, and investors looking to operate a rental unit in the corridor. One-bedrooms, averaging around 650 sq ft, are sized for a couple or a working professional who wants a proper separate bedroom. The two-bedroom at 1,249 sq ft provides genuine family-size accommodation.
Apartments Across Three Configurations
The project is apartments only. The full range runs from compact studio to a proper two-bedroom. Studios suit investors more than owner-occupiers given the square footage. One-bedrooms work for both groups. Two-bedrooms draw families and longer-term residents who want a settled home base in the district.
Amenities: Wellness and Security Combined
| Category | Amenities |
|---|---|
| Wellness | Indoor Swimming Pool, Gymnasium, Shared Spa |
| Security | CCTV Security, Security |
| Family | Children's Play Area |
| Practical | Covered Parking |
The indoor pool, gymnasium, and shared spa give residents three distinct wellness options without needing an external membership. The shared spa adds a recovery-focused facility that goes beyond the standard gym-and-pool setup and has a tangible effect on daily comfort. The children's play area tells you the developer designed this for residents who plan to live there, not only for investors. Covered parking in Dubai's climate is a baseline quality-of-life factor.
Completion: December 2025
Construction started in October 2023. The scheduled completion date was December 2025, which has now passed. The project has likely reached or is in its handover phase. Buyers entering now are looking at a finished building, not an off-plan position waiting on a future delivery.
Getting In for 10%
| Stage | Payment |
|---|---|
| Down payment | 10% |
| During construction | 30% |
| Handover | 60% |
The 10% entry is the project's most notable number. The construction period took 30%, spread across roughly two years of build time. The remaining 60% falls at handover. Given the December 2025 completion date has passed, a buyer entering now faces that 60% as an immediate payment rather than a future event at the end of a construction schedule. The handover settlement is the key financial event in this purchase.







