Costa Brava Phase 2: Townhouses and Villas at Damac Lagoons
Costa Brava Phase 2 is a sub-community within Damac Lagoons, developed by Damac Properties. It offers townhouses and villas within a lagoon-themed master-planned development in the Dubailand corridor, roughly 30 kilometres from Downtown Dubai. Damac Properties is one of the UAE's largest private developers, with a broad portfolio of master communities across Dubai and beyond.
The Costa Brava cluster sits inside the wider Damac Lagoons concept, which is structured around shared waterfront amenities, beach clubs, and community facilities spread across multiple phases. Phase 2 is the second delivery within the Costa Brava pocket of that master plan.
Damac Lagoons: What the Location Means
Damac Lagoons is positioned off Hessa Street (D61), between Emirates Road and Sheikh Mohammed Bin Zayed Road. That puts it roughly 15 to 20 minutes by car from Mall of the Emirates and around 25 minutes from Dubai Marina, depending on traffic.
The area is car-dependent. There is no metro access. Daily errands require a drive, and the surrounding infrastructure is still maturing. For buyers who prioritise space, community amenities, and a quieter environment over urban density, the trade-off makes sense. For renters or investors targeting professionals who rely on public transport, the location is a real constraint.
Al Maktoum International Airport is within 20 minutes, which matters for buyers whose commute or lifestyle ties them to Expo City or the South Dubai corridor.
Entry at AED 1,535,000
The listed price is AED 1,535,000. Both the minimum and maximum sit at the same figure, which means the available inventory is likely priced at a single unit tier rather than across a spread. At AED 1.535 million, you are looking at 3-bedroom townhouse territory in a gated master community with lagoon-themed shared facilities.
For context, this sits in the mid-range for gated townhouse and villa communities in this part of Dubai. The pricing reflects the Damac Lagoons master-plan premium and the delivered or near-delivered status of this phase.
Unit Types: 3-Bedroom Townhouses to 6-Bedroom Villas
The project spans two property types across six unit configurations:
| Type | Bedrooms |
|---|---|
| Townhouse (LTH-3B-M) | 3 |
| Townhouse (LTH-4B-M) | 4 |
| Townhouse (LTH-5B-E / LTH-5B-EM) | 5 |
| Villa (LV-3B) | 5 |
| Villa (LVD-1B) | 6 |
Townhouses suit growing families looking for villa-style living at a lower entry price. The 3 and 4-bedroom configurations are the natural starting point for most buyers at the listed price. Larger villas (5 and 6 bedrooms) serve extended families or buyers who want a premium product within the same community, with the added privacy and space a detached villa provides over a townhouse row.
Amenities
| Category | Amenities |
|---|---|
| Wellness and Fitness | Shared Gym, Shared Pool, Shared Spa, Children's Pool |
| Outdoor and Leisure | Walkways, Balcony, Children's Play Area |
| Home Features | Study, Built-in Wardrobes, Maids Room, Maid Service, Covered Parking |
| Community | Security, Pets Allowed |
Fourteen amenities in total. The combination of a shared spa, dedicated maids room, maid service, and study inside units positions this firmly at the upper end of the mid-market family segment. The amenity set is not entry-level. It signals a buyer profile that expects household support infrastructure alongside leisure facilities. Pets Allowed is worth noting for buyers with animals, as this is not universal in gated communities.
Already at or Near Handover
Construction started in March 2022. The expected completion date was 29 July 2025. As of mid-2026, this project has passed its stated completion date, which means it is likely already handed over or in final delivery stages.
That shifts the buyer profile significantly. You are not waiting three or four years for a completed asset. Construction risk is largely behind this project. The relevant questions now are about actual delivery quality, unit condition, and community activation, not whether the project will be finished.
The Payment Structure: 20% to Start
| Stage | Share |
|---|---|
| Down Payment | 20% |
| During Construction | 60% |
| Handover | 20% |
The 20% down payment means AED 307,000 upfront. The remaining 60% was structured across the construction period, with the final 20% due at handover. There is no post-handover component. All payments fall within the delivery timeline, which is now concluded or very close to it.







