Ola Residences, Al Marjan Island
Ola Residences is an apartment development by Lacasa Living Development, on Al Marjan Island in Ras Al Khaimah. Construction began in January 2025, with handover scheduled for January 2027. The entry point is a 10% down payment, which puts the opening cash commitment at roughly AED 118,000 on the most affordable unit in the range.
Al Marjan Island: What the Location Means
Al Marjan Island sits off the Ras Al Khaimah coastline, extending into the Arabian Gulf. The island is built as a series of coral-shaped peninsulas, so water surrounds a large proportion of its surface area. That layout means a waterfront or water-adjacent address is more accessible here than in developments where only the front row faces the sea. The island has a resort character, with hotels, restaurants, and leisure facilities concentrated here rather than spread across the emirate.
For Dubai-based buyers, the drive is roughly 45 minutes, which works well for a second home or investment property. For anyone commuting into central Dubai regularly, the trip to Dubai Marina or Business Bay runs close to an hour each way. Ras Al Khaimah city is under 15 minutes from the island, with services and facilities within easy reach. For residents who work in RAK or remotely, the waterfront setting is the primary draw.
What AED 1.18M to AED 2.07M Covers
Prices run from AED 1,180,000 to AED 2,070,000, with apartments as the only property type. A spread of nearly AED 900,000 within a single type reflects genuine variation in unit size. At the lower end, buyers are most likely looking at one-bedroom configurations suited to individual occupants or investors. At the upper end, the numbers suggest two- to three-bedroom units that work for families or buyers planning a longer stay.
An Indoor Pool on an Island
| Theme | Amenities |
|---|---|
| Wellness & Recreation | Indoor Swimming Pool, Gymnasium |
| Outdoor & Family | Landscaped Gardens, Children's Play Area |
| Food & Convenience | Restaurants |
| Security | CCTV Security |
An indoor pool on an island project is a specific choice. It makes the building self-contained through RAK's summer months, when outdoor conditions are extreme, and extends climate-controlled swimming access year-round. The Children's Play Area and landscaped gardens together signal a family-oriented resident profile rather than a predominantly transient one. The on-site restaurant reduces daily friction for residents who prefer not to leave the building for meals.
The set is functional, not luxury-tier. No spa, no coworking space, no concierge. The building covers daily needs without reaching for a hotel standard.
Handover in Two Months
Construction began in January 2025. The target handover is January 2027, approximately two months from now. For a buyer entering at this stage, the construction period is effectively at its close. The build spans two years from groundbreaking to completion.
Getting In for 10%
| Stage | Payment |
|---|---|
| Down payment | 10% |
| During construction | 30% |
| At handover | 60% |
Ten percent down secures the unit. The 30% construction instalment covers the remaining construction period, which at this point is a matter of weeks. The 60% at handover falls due in January 2027, making it the defining financial event of this purchase.
At 10% entry, the upfront cost on the cheapest unit in the range is approximately AED 118,000. The structure keeps early outlay low while concentrating the bulk of the purchase price at a single point near completion.
















