Equiti Gate: Jebel Ali Apartments with 70% Due After Handover
Refine Development built Equiti Gate in Jebel Ali Industrial 2, a subdistrict on the southwestern edge of Dubai close to Jebel Ali Port and the free zone corridor. The project is apartments only, and its payment structure stands out: buyers pay just 30% during construction, with 70% due after handover.
Where Jebel Ali Industrial 2 Puts You
Jebel Ali sits roughly 35 kilometres from Downtown Dubai, closer to the Abu Dhabi border than to Business Bay. Sheikh Zayed Road runs through the area, connecting residents directly to Dubai Marina (around 15 minutes) and Downtown (35 to 45 minutes depending on traffic).
The area sits adjacent to Jebel Ali Free Zone (JAFZA) and the port complex. For anyone working in JAFZA, the industrial cluster, or the broader logistics sector, the commute from Equiti Gate is short. For those based in central Dubai, it is a longer daily drive.
The immediate surroundings are industrial in character. Equiti Gate introduces a residential address into that environment. The range of on-site facilities suggests the project is built to function as a self-contained community rather than one that relies on walkable neighbourhood infrastructure.
AED 580,000: The Entry Point and What It Gets You
The listed starting price is AED 580,000. The project carries a wide unit mix for a single residential building. Studios run from 363 to 443 sq ft. One-bedroom apartments span multiple layouts from 599 to 879 sq ft, giving buyers a real choice of footprint within the same bedroom count. A two-bedroom sits at 1,465 sq ft. The three-bedroom is listed at 1,269 sq ft, which is smaller in floor area than the two-bedroom. Buyers comparing those two configurations should look at that detail carefully before deciding.
The unit range targets different buyer types. Investors chasing smaller, lower-ticket apartments have studio and compact one-bedroom options. End-users who need more space can move into the larger one-bedroom layouts or the two-bedroom.
Eleven Amenities in an Industrial-Adjacent Address
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Well-being and Fitness |
| Outdoor | Shared Pool, Landscaped Gardens, Barbecue Area, Children's Play Area |
| Retail and Dining | Retail Facilities, Restaurants |
| Infrastructure | Mosque, Basement Parking, CCTV Security |
Including retail facilities, restaurants, and a mosque on-site is a deliberate call in a location where the surrounding streetscape offers limited amenities. The amenity set tells you something about the intended resident: someone who will spend meaningful time in the building and its grounds rather than stepping out to a walkable strip of cafes and shops. The children's play area and barbecue space point toward families and community use, not just investment-oriented buyers.
A Completion Date That Has Already Passed
Construction started in April 2024 and the expected completion date was December 2024. That date is now in the past. Buyers looking at this project are likely dealing with a completed or near-completed building rather than a long construction window ahead of them.
Getting In for 30%: How the Payment Plan Works
| Phase | Percentage | Amount (at AED 580,000) |
|---|---|---|
| During Construction | 30% | AED 174,000 |
| Post-Handover | 70% | AED 406,000 |
A buyer at the AED 580,000 price commits AED 174,000 during the construction phase. The remaining AED 406,000 lands at handover as a single payment. This structure keeps the upfront capital commitment low relative to the total purchase price during the build period.
The trade-off is straightforward: the post-handover settlement is a lump sum, not a phased plan. Buyers using a mortgage need financing arranged and ready before the handover date. Those buying cash should plan for that outlay to fall at key collection.














