Yigo Luxe, Dubai Silicon Oasis
YIGO Developments is bringing Yigo Luxe to Dubai Silicon Oasis, an integrated technology park and residential community in the southeastern corner of Dubai. Construction began in October 2026, with handover targeted for June 2030. The project offers apartments across a wide price and size range.
A Self-Contained District on Dubai's Eastern Corridor
Dubai Silicon Oasis sits roughly 20 kilometres from Downtown Dubai, near the intersection of Sheikh Mohammed Bin Zayed Road and Dubai Al Ain Road. That location connects residents to two of the emirate's main arterial routes. Dubai International Airport is a 15- to 20-minute drive away, which matters for frequent travellers and buyers considering short-term rental potential. The community operates more like a small town than a typical residential cluster: it contains its own retail, schools, dining, and business parks within its boundaries.
For a buyer who works in the technology corridor east of the city, this is a practical base. For a buyer who needs to be in the financial centre or Dubai Marina daily, the commute is workable but not short. The district draws a mix of owner-occupiers who want community and value below inner-city pricing, and investors who target rental income from the employed population that lives and works inside the free zone.
One Property Type, a Ten-to-One Price Range
Yigo Luxe offers apartments only. The price range runs from AED 798,000 to AED 7,980,000. That is a ten-to-one spread within a single property type. A range this wide in an apartment-only development signals meaningfully different product tiers across the building, likely differentiated by floor level, unit size, and view. The lower end suits a buyer focused on rental yield from a compact studio or one-bedroom unit. At mid-range, around AED 2M to AED 4M, the buyer is looking at a larger apartment for owner-occupation. At the upper end, approaching AED 8M, the decision is about space and position rather than yield.
The wide spread means this project has no single target buyer. Entry point and purpose drive the decision.
A Year-Round Pool Sets the Tone
| Category | Amenities |
|---|---|
| Fitness and leisure | Indoor Swimming Pool, Gymnasium |
| Outdoor and landscaping | Landscaped Gardens |
| Dining | Restaurants |
| Family | Children's Play Area |
| Security | CCTV Security |
The indoor pool stands out in this list. Most apartment projects in Dubai offer outdoor pools that sit unused for four or five months each summer. An indoor pool makes the facility practically year-round. The on-site restaurant and children's play area, combined with the landscaped gardens, suggest a resident who spends real time within the building rather than treating it as a stopover. This is a family-oriented amenity set, not one built for young professionals looking for rooftop social spaces.
Three and a Half Years to Handover
Construction started in October 2026. The expected completion date is June 2030, a build period of roughly three and a half years. Buyers entering at construction start have the full build period across which to distribute the 30% construction-phase payments before the large handover amount falls due.
Getting In for 20%
| Stage | Percentage |
|---|---|
| Down payment | 20% |
| During construction | 30% |
| On handover | 50% |
The 20% down payment is standard for Dubai off-plan. The structure is notably back-loaded: 50% falls due at handover in June 2030. That is the single largest payment in the schedule. The 30% paid during construction spreads across roughly three years of build, so the mid-period cash demand is relatively light. The weight of the financial commitment arrives at the end.














