Alfulaiti Residence: Apartments from AED 500K in Dubai Land
Alfulaiti Residence is a residential project by Alfulaiti Development in Dubai Land Residence Complex. It offers studios, one-bedroom, and two-bedroom apartments priced between AED 500,000 and AED 1,200,000. Construction started in August 2026, with handover targeted for January 2029.
Eastern Dubai on Al Ain Road
Dubai Land Residence Complex sits in the eastern part of Dubai, connected to the city via Al Ain Road (E66) and Emirates Road (E611). Downtown Dubai and Business Bay are roughly 30 to 35 minutes away in off-peak traffic. Dubai International Airport is accessible in a similar timeframe heading north.
The district is predominantly residential. Pricing at Alfulaiti Residence reflects the eastern location: apartments start at AED 500,000, a price level that reflects the area's distance from Dubai's central core. The commute time and suburban character of DLRC are the practical trade-offs against those pricing levels.
What AED 500K to AED 1.2M Covers
The price range runs from AED 500,000 for a studio to AED 1,200,000 for a two-bedroom. The one-bedroom sits at AED 790,000.
Each tier targets a different buyer. A studio at AED 500,000 suits a solo investor or a first-time buyer entering the off-plan market at lower capital exposure. The AED 790,000 one-bedroom targets a professional or a couple who want a dedicated bedroom separate from a living area. The AED 1,200,000 two-bedroom fits a small family or a buyer who wants a guest room or home office.
The AED 700,000 spread across the project reflects unit type differences, not variation within a single category.
Apartments by Unit Type
| Unit Type | Starting Price |
|---|---|
| Studio | AED 500,000 |
| 1-Bedroom | AED 790,000 |
| 2-Bedroom | AED 1,200,000 |
All three types carry a Type A layout. The project is contained within a single building.
What the Amenity Set Says
| Category | Amenities |
|---|---|
| Fitness & Wellness | Indoor Swimming Pool, Gymnasium |
| Outdoors | Landscaped Gardens |
| Family | Children's Play Area |
| Dining | Restaurants |
| Security | CCTV Security |
Six amenities is a lean but coherent offering. The indoor swimming pool is the standout. An enclosed pool operates year-round, unaffected by Dubai's summer temperatures that make outdoor pools impractical during daytime for several months. The gym, children's play area, and landscaped gardens together point toward a family-oriented or long-term resident profile. On-site dining is a practical convenience layer for residents.
Two and a Half Years to Handover
Construction began on August 5, 2026. Expected completion is January 2029, giving off-plan buyers approximately two and a half years before handover. The project is at the very start of its build cycle.
The 30% during-construction tranche will be called in stages across 2026 through 2028, spreading that payment obligation across the full build period.
20% Down, 50% at the Keys
| Stage | Payment Share |
|---|---|
| Down payment | 20% |
| During construction | 30% |
| Handover | 50% |
Entry requires 20% on signing. The 30% construction tranche follows in installments through 2028. The remaining 50% falls due at handover in January 2029.
The plan is back-loaded. The largest single payment arrives at the moment ownership transfers. For buyers using mortgage financing, this aligns with when a home loan is drawn down. For cash buyers, the majority of capital commits at the January 2029 handover rather than during the build period.

