Bab Al Qasr Resort Residence: Masdar City Apartments at AED 1.28M
Bab Al Qasr Resort Residence is an apartment development by Burtville in Masdar City, Abu Dhabi. Construction began in February 2025, with handover scheduled for September 2028. The project spans one- to five-bedroom apartments, and the confirmed entry price is AED 1,280,000 for a one-bedroom unit.
The most notable feature of this project is the payment structure. A 5% down payment at signing sets a low entry bar.
Getting In for 5%
| Payment Stage | Percentage |
|---|---|
| Down payment | 5% |
| During construction | 95% |
AED 64,000 secures your unit at signing. The remaining 95% pays against construction milestones across a 43-month build period. There is no post-handover plan, meaning all payments settle before the September 2028 delivery date.
For a self-funded buyer, the staged construction payments spread capital commitment across three years rather than concentrating it at the front. For a mortgage-funded buyer, the draw-down profile must match the construction schedule from signing; a facility that covers staged installments across the full build period is required. The advantage of construction-linked payments is that each draw tracks progress on the ground. Once you take possession in September 2028, there are no further payment obligations.
What AED 1.28M Buys You Here
The confirmed price of AED 1,280,000 is the one-bedroom entry point. The development also includes two-, three-, four-, and five-bedroom apartments, spanning from single-occupant buyers through to families looking for larger floor plates.
The breadth of bedroom configurations means different buyers will find different use cases. A one-bedroom at AED 1.28M suits an individual buyer, a couple, or an investor targeting the rental market at this price level. A five-bedroom in the same project is a different proposition: more capital through the construction period, a different end-user or family profile, and a longer investment horizon. Each size tier carries its own logic.
For buyers weighing multiple Abu Dhabi off-plan options, the 5% down structure at this price point means a lower immediate commitment than developments requiring larger upfront deposits.
Masdar City: What the Location Actually Means
Masdar City is a planned development district in Abu Dhabi, situated approximately 30 kilometres from the city centre and close to Abu Dhabi International Airport. Its design is organized and lower-density than traditional Abu Dhabi neighbourhoods, built to planned specifications rather than developed organically over time.
Living here, the airport is a short drive. Central Abu Dhabi involves real road time. Residents who work in the airport corridor or within Masdar itself have a practical commute. Those travelling daily to the older districts or the corniche are accepting a longer journey each way.
For an investor, the rental demand here connects to proximity: to the airport, to the surrounding employment zones, and to the structured environment of the district itself. Buyers taking an investment position in Masdar City are betting on residents who work near this corridor rather than buyers driven by proximity to central Abu Dhabi lifestyle amenities.
Three and a Half Years to Handover
Construction broke ground in February 2025. Completion is targeted at September 2028, a 43-month build. An off-plan buyer entering now commits through the full construction window.
September 2028 is the anchor date: final payment, possession, and the start of any rental or occupancy timeline. The construction-period payment schedule means draws are tied to build progress, which gives buyers a natural checkpoint at each milestone. There are no obligations after the handover date.
Burtville is the developer on record. The project is registered and active in Abu Dhabi, with construction having commenced in early 2025.
Who This Project Suits
Bab Al Qasr Resort Residence targets buyers who want low upfront exposure in a planned Abu Dhabi district and can commit through a 43-month off-plan build. The 5% entry reduces the initial capital barrier to AED 64,000, while the Masdar City location sets the target resident profile: practical access to the airport corridor, a quieter planned environment, and a more structured urban setting than central Abu Dhabi.
One- to five-bedroom configurations serve different household sizes and investment strategies. The confirmed floor is AED 1,280,000 for a one-bedroom apartment.





