Lush at DAMAC Riverside: Four-Bedroom Townhouses in Dubai Investment Park 2
A Damac Community Taking Shape in DIP 2
Lush is a townhouse phase within DAMAC Riverside, a master community that Damac Properties is building inside Dubai Investment Park 2. The project sits within a larger planned development, bringing residential product to a district that has been transitioning away from its industrial origins.
The available configuration is 4-bedroom townhouses, priced at AED 3,650,000. A single price point across the listed inventory means buyers are evaluating one proposition, not choosing between price tiers.
What the Location Means for Daily Life
DIP 2 occupies the western fringe of Dubai, positioned along Emirates Road (E611) with direct access to Sheikh Mohammed Bin Zayed Road. Driving to Dubai Marina takes roughly 25 to 30 minutes; Downtown Dubai is around 35 to 40 minutes in typical traffic.
The practical trade-off is space versus proximity to central Dubai. Multi-bedroom townhouse formats in closer-in districts carry a significant price premium. DIP 2 offers the floor plate without the premium address, which suits families prioritising bedroom count and private outdoor space over postcode.
For investors, DIP 2's ongoing development is the core argument. The district is still building out, and buyers entering now are positioning ahead of further infrastructure completion rather than buying into a fully-priced neighbourhood.
AED 3,650,000 for a Four-Bedroom Home
The price is AED 3,650,000 for a 4-bedroom townhouse. With a single listed price across available inventory, a buyer knows exactly what entry looks like.
A four-bedroom townhouse in a master-planned community with a full amenity package is the proposition. Damac Properties as the developer adds context to the project's scale and delivery approach.
Indoor Pool and a Family-Oriented Amenity Set
| Category | Facilities |
|---|---|
| Recreation | Gymnasium, Indoor Swimming Pool, Barbecue Area |
| Outdoor | Landscaped Gardens, Children's Play Area |
| Services | Restaurants, CCTV Security |
The standout here is the indoor swimming pool. In Dubai's climate, outdoor pools are effectively seasonal. An indoor facility changes the usability equation substantially, particularly for families with young children who swim year-round.
Restaurants inside the community boundary reduce the everyday need to leave the development. The gymnasium, landscaped gardens, and children's play area form a set that clearly targets families planning to use the community as their primary daily environment, not just a place to sleep.
Three Years to Handover
Construction started in September 2024 and expected completion is 31 December 2027. From today, that is roughly 38 months before keys change hands.
For investors, rental income only follows completion. For end-users, the question is accommodation through the build period. The confirmed construction start is a meaningful signal: this project has broken ground, which removes the uncertainty common in earlier-stage off-plan announcements.
In for 20% Down
| Payment Stage | Share |
|---|---|
| Down Payment | 20% |
| During Construction | 55% |
| Handover | 25% |
The 20% down payment on AED 3,650,000 is AED 730,000 to secure the unit. The remaining purchase price splits between construction instalments and a final balance at handover.
The construction phase covers 55% of the total price, spread across the build period through December 2027. The final 25% is due at handover. Buyers commit a significant portion of the purchase price while the project is actively being built, with the balance settling when construction completes.



