Park Field, Dubai Hills Estate: Emaar Delivers Apartments and Duplexes from AED 1.06M
Park Field is a residential development by Emaar Properties in Dubai Hills Estate. It spans two buildings and offers one, two, and three-bedroom apartments alongside two-bedroom duplexes. Construction began in October 2022, and the project reached its expected completion milestone in December 2025.
Dubai Hills Estate: Where It Sits and Why It Matters
Dubai Hills Estate is a master-planned community positioned along Al Khail Road in the middle of Dubai's residential corridor. Downtown Dubai and Dubai Marina are each roughly 15 to 20 minutes by car on a clear run. The access is direct without routing through central congestion.
The district has functioning internal infrastructure: a mall, a hospital, schools, and significant parkland. For buyers choosing between expensive central apartments and distant suburb developments, Dubai Hills Estate occupies a practical middle ground. It works for professionals commuting to Business Bay, DIFC, or the Marina, and for families who want amenities within the community without city-center density.
What AED 1.06M to AED 3.07M Covers
The price range runs from AED 1,060,000 to AED 3,075,000, nearly a three-fold spread that maps directly to the unit mix.
One-bedroom apartments start at AED 1,060,000, with sizes between 645 and 855 sq ft. These are the entry point for the development. They suit investors targeting rental demand from professionals, or first-time buyers stepping into this district.
Two-bedroom apartments start at AED 2,042,500, with sizes ranging from about 988 to 1,826 sq ft. The size variation within the two-bedroom tier is wide. A buyer who searches across both buildings and floor plans can find significantly different amounts of space at the same starting price.
Two-bedroom duplexes start at the same AED 2,042,500 but offer a different format: around 2,011 sq ft across two levels. For buyers who want a house-like feel without stepping up to a villa or townhouse, the duplex is a distinct option worth comparing against the standard apartments.
Three-bedroom apartments start at AED 3,075,000, with sizes from 1,358 to 2,198 sq ft. At the top of the range, these target families or buyers consolidating into a larger apartment format.
Apartment or Duplex: Who Each Unit Type Suits
The one-bedroom apartments suit investors and single occupants best. Lower entry price, straightforward rental or resale profile. Two-bedroom apartments cover young couples, small families, and investors who need more space without the duplex format. The two-bedroom duplex appeals to self-occupiers who want architectural variety or the feel of two floors. Three-bedrooms target family buyers or those who need a home office alongside multiple bedrooms without leaving the apartment format.
Six Amenities, One Worth Noticing
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Running Track |
| Pool | Shared Pool |
| Dining and Retail | Restaurants, Retail Facilities |
| Pet Policy | Pets Allowed |
The amenity list is practical rather than extensive. A gymnasium and running track address fitness. The shared pool is standard at this price point. On-site restaurants and retail reduce the need to leave for daily needs.
Pets Allowed is the entry that filters buyers most directly. For pet owners, this policy narrows the shortlist and Park Field makes the cut.
A December 2025 Handover
The expected completion date was December 15, 2025. The project has passed that milestone as of mid-2026. Buyers entering now are acquiring a completed or near-completed property rather than a long-horizon off-plan unit. The risk profile differs meaningfully from a project still several years from delivery.
Getting In at 10%
| Payment Stage | Percentage |
|---|---|
| Down payment | 10% |
| During construction | 60% |
| Handover | 30% |
A 10% down payment is at the low end for a project in this price range. The plan runs 60% across the construction period and closes with 30% at handover.
With construction complete or nearly so, buyers entering now face a condensed payment timeline. The construction installments are at or approaching their due dates, and the 30% handover balance is the immediate financial commitment.







