Prive Residence: Apartments in Dubai Hills Estate by Ginco Properties
Prive Residence is an apartment development by Ginco Properties in Dubai Hills Estate. The project offers studios, one-bedroom, and two-bedroom units.
A Location with Real Infrastructure
Dubai Hills Estate sits midway between Downtown Dubai and Dubai Marina, connected to both by Al Khail Road. The district has matured into a self-contained residential community with a golf course, a hospital, schools, and Dubai Hills Mall within its boundaries. For a buyer weighing location value, this matters. You can cover most daily needs inside the community, and the highway access keeps the rest of Dubai within reach.
The address positions Prive Residence within this established infrastructure. For an investor, Dubai Hills Estate draws both owner-occupiers and tenants who want a quieter alternative to the Marina or Downtown without giving up connectivity.
What AED 871K to AED 1.94M Gets You Here
The price range runs from AED 871,538 for a studio to AED 1,938,986 for a two-bedroom. That is a wide spread, but it maps directly to three distinct unit types.
The studio sits at 434 sq ft and starts at AED 871,538, putting the price per square foot at around AED 2,008. This is the entry point for a buyer focused on acquisition cost and rental yield. At this size, the target is either a solo professional or an investor looking at long-term rental income.
The one-bedroom at 682 sq ft starts at AED 1,353,006. This format works for couples, relocating professionals, or an investor who wants a unit with broader tenant appeal. At roughly AED 1,984 per sq ft, the rate is consistent with the studio.
The two-bedroom at 1,008 sq ft starts at AED 1,938,986, sitting at around AED 1,923 per sq ft. This is the choice for a small family or someone prioritising living space. The price step-up from one-bed to two-bed is significant, but the square footage jump from 682 to 1,008 sq ft is proportional.
What the Amenity Set Tells You
| Category | Facilities |
|---|---|
| Health & Fitness | Gymnasium |
| Safety | Security |
| Outdoor | Barbecue Area |
Three amenities is a lean stack for a Dubai Hills Estate address. You get a gym, building security, and a barbecue area. This is not a resort-style complex. The target resident values location and price over in-building facilities, and is likely to use the parks, trails, and retail that Dubai Hills Estate provides at the district level. If an extensive amenity list is a priority, this project will not satisfy it. If you want a clean, functional building in a strong location, the lean amenity set is a trade-off worth knowing about.
Timeline: Past the Scheduled Delivery Date
Construction on Prive Residence began in November 2021. The scheduled completion date was October 2023, which has now passed. A buyer looking at this project today is most likely considering a completed building rather than an off-plan wait.
Getting In for 10% Down
| Payment Stage | Percentage |
|---|---|
| Down payment | 10% |
| During construction | 15% |
| On handover | 75% |
The 10% down payment is a low entry point for an off-plan apartment in Dubai. The structure places the financial weight firmly at handover: 75% falls due at completion. For a buyer who entered during the construction phase, the bulk of the cash requirement arrives when the keys do.







