Chorisia 2 Villas: Five-Bedroom Al Barari Villas at a Fixed Price
Al Barari develops and manages the master-planned community that carries its name, a low-density residential enclave east of Sheikh Mohammed Bin Zayed Road in Dubai. Chorisia 2 Villas is one of the villa clusters within that community, offering a single five-bedroom configuration to buyers looking for a large-format family home inside a gated, green neighbourhood.
What the Al Barari Address Means
Al Barari sits in the Wadi Al Safa area, roughly 20 to 25 minutes from Downtown Dubai by car. Sheikh Mohammed Bin Zayed Road connects residents to Business Bay, Meydan, DIFC, and Dubai Hills Estate within 20 to 30 minutes. Dubai International Airport is approximately 30 minutes east. Mall of the Emirates is around 20 minutes south.
This is a car-dependent address. The community layout centres on botanical gardens, walking paths, and water features rather than retail or commercial strips. Internal roads are quiet, density is low, and most daily errands require a car once outside the community boundary.
That setting suits a particular buyer: one who values a calm, green home environment and is comfortable with a car-based daily routine. The commute times above reflect low-traffic conditions; peak hours add time to all routes.
Al Barari is an established residential community in this part of Dubai. Chorisia 2 Villas sits within it as a sub-development, placing new residents inside a functioning neighbourhood from day one.
One Type, One Price
Every unit in Chorisia 2 Villas is a five-bedroom villa, Type A, listed at AED 5,646,614. There is no spread across configurations or price tiers.
A single-price, single-configuration release signals a standardised product. There is no floor-level premium, no view variation, and no smaller entry option. At AED 5.6 million, this sits in the upper tier of villa pricing in Dubai. The buyer this targets has already decided on a five-bedroom format in Al Barari, rather than still comparing locations.
The five-bedroom layout works for a larger family, or for a buyer who needs space for a home office, live-in staff, and regular guests without compromising on bedroom count.
Amenities
| Category | Amenities |
|---|---|
| Active | Cycle track, Running track |
| Kids | Children's pool, Children's play area |
| Parking | Covered parking |
Five amenities focus on outdoor activity and family use. The cycle track and running track give residents an exercise option within the project. The children's pool and play area cater to families with younger children. Covered parking addresses the practical demands of a car-reliant household.
The outdoor and family emphasis points to a resident who prioritises space and active outdoor use over concierge services or a full building podium. This is a villa cluster, not a serviced apartment tower.
Project Timeline
Construction on Chorisia 2 Villas began in January 2024, with an expected completion of March 2024. That date has now passed. The project may already be at the handover stage.
For a buyer considering this today, Chorisia 2 is not an off-plan purchase with a multi-year wait. The units may be completed and ready for transfer, which changes the nature of the commitment significantly.
Down 30%, Balance at Handover
| Stage | Percentage | Amount (AED) |
|---|---|---|
| Down payment | 30% | 1,693,984 |
| Handover | 70% | 3,952,630 |
The payment plan runs in two tranches: 30% at signing and 70% at handover. Nothing is deferred beyond the transfer date.
AED 1.69 million secures the unit at signing. The remaining AED 3.95 million is due at handover. With the expected completion date already in the past, both payments could fall within a short window for a buyer entering now. The structure is straightforward: two large sums, no construction milestones in between, and no installments after handover.







