W Residences Dubai Harbour by Arada: From Entry Apartments to Full-Floor Penthouses
The price range on W Residences Dubai Harbour tells you what kind of project this is before you read another word. At AED 4.27 million on the low end and AED 40 million at the top, you are looking at one of the broader spreads in Dubai Harbour. ARADA has structured this project to serve very different buyer profiles under one address, and understanding the spread is the first step.
AED 4.27M to AED 40M: What the Range Actually Means
One-bedroom apartments start at AED 4.27 million, with unit areas ranging from 1,072 to 1,494 square feet. For Dubai Harbour, these are not small. The floor plates are generous for the bracket. Two-bedroom apartments start at AED 5.579 million with layouts running from 1,538 to over 2,263 square feet across multiple configurations.
The upper range is a different product entirely. Three-bedroom duplexes start at AED 7.17 million across 4,842 square feet. Four-bedroom duplexes step up to AED 18.89 million across 4,574 square feet. The five-bedroom penthouse is listed at AED 40 million over 7,511 square feet. The spread exists because apartments, duplexes, and penthouses are fundamentally different assets. This is not one product at different sizes. It is three distinct residential offerings within a single tower.
Dubai Harbour: What This Address Means Day to Day
Dubai Harbour sits between Dubai Marina and Palm Jumeirah. That position puts residents within easy reach of Sheikh Zayed Road and the Marina interchange. Dubai International Airport is roughly 30 to 40 minutes depending on traffic. Al Maktoum Airport is a comparable drive in the other direction.
The area is built around a working marina and cruise terminal. This is not a quiet residential enclave. The waterfront is active, with marine activity and a commercial energy that shapes the feel of the district. For buyers with an investment lens, the location extends the Marina and JBR waterfront catchment area north toward the Palm, without the land premium of the Palm itself.
Three Products, Three Buyer Profiles
The one and two-bedroom apartments target buyers who want a premium waterfront address with an accessible entry point by Dubai Harbour standards. Over 1,000 square feet for a one-bed at AED 4.27 million positions these units competitively within the district for that size category.
The three and four-bedroom duplexes are for buyers who want substantial space inside a high-rise. At 4,500 to nearly 5,000 square feet spread across two levels, these units offer a scale that most tower apartments in Dubai Harbour cannot match. The two-floor layout gives residents a different living dynamic than a standard flat.
The five-bedroom penthouse at AED 40 million across 7,511 square feet is a separate category. Full-floor positioning, harbour and sea exposure, and a price-per-square-foot that reflects that. This is not the same decision as the apartment purchase.
What the Amenity Set Reveals
| Category | Amenities |
|---|---|
| Outdoor & Active | Landscaped Gardens, Cycle Track, Barbecue Area |
| Dining & Social | Cafe and Restaurants |
| Leisure | Shared Pool |
| Family & Lifestyle | Children's Play Area, Pets Allowed |
Seven amenities is a focused list. The cycle track is the notable addition here. Dubai Harbour has dedicated cycling infrastructure that connects to the broader waterfront path network, making this a functional amenity rather than a decorative one. Pets allowed is a practical differentiator that filters in buyers who rule out towers on this basis alone. The overall set targets active residents and young families, not buyers looking for a hotel-style amenity deck.
Getting In at 10% Down
| Payment Phase | Percentage |
|---|---|
| Down payment | 10% |
| During construction | 50% |
| Handover | 40% |
A 10% down payment is low for a branded residential project at this price level. The remaining payments track construction, with 40% due at handover. There is no post-handover instalment plan, so the full balance falls due at the point of key collection.
The Build Window: June 2025 to December 2028
Construction started in June 2025. Expected completion is December 2028. That is approximately three and a half years from now. For an off-plan buyer entering today, the 10% down secures the unit while the larger payment obligations are deferred across the build period. The end-of-2028 handover gives a defined timeline to plan around.







