Trillionaire Residences by Binghatti, Business Bay
Binghatti Developers built Trillionaire Residences in Business Bay. Construction started in January 2023, with an expected completion of June 2024. That date is now more than two years in the past, which changes how a buyer should approach this project. The building has likely been through handover. Apartments are listed at a single price of AED 2,022,936.
Business Bay: What the Address Means in Practice
Business Bay spans both sides of the Dubai Canal between Downtown Dubai and DIFC. Sheikh Zayed Road runs along the western edge of the district, and Al Khail Road provides an eastern alternative. The canal promenade connects the Business Bay waterfront to the Burj Khalifa precinct on foot. DIFC and the financial core are a short drive away.
For a resident, that geography means multiple commute routes to the CBD and walkable access to the canal waterfront. The district has a dense mix of offices, hotels, and residential towers lining the canal, with active retail and dining at street level. Business Bay is a functioning mixed-use environment, not a stretch of towers still waiting for ground-floor services to open.
The combination of corporate offices, hotels, and residential buildings in the same district creates demand from both long-term residents and shorter-stay tenants.
One Price Point: AED 2,022,936
The listed price stands at AED 2,022,936 at both the floor and the ceiling. That is not a range. One product type, one price.
When the floor and ceiling match, the evaluation is direct: does this apartment, at this price and in this building, make sense for the buyer. There is no lower-cost entry point within the project, and no premium tier above it.
What the Amenity Set Says About the Building
| Category | Facilities |
|---|---|
| Fitness | Health Club, Gymnasium |
| Leisure | Shared Pool, Children's Play Area |
| Dining | Restaurants |
Five amenities spanning fitness, leisure, and dining. The fitness side is split between a health club and a separate gymnasium, meaning two distinct training environments in the same building. The shared pool and children's play area make up the outdoor leisure offering. An on-site restaurant gives residents a food option without leaving the complex.
Reading the amenity set as a whole, this building is aimed at residents planning longer stays. Families and professionals on extended contracts will find this combination more useful than a buyer looking for a minimal base. The children's facilities and multi-option fitness setup are deliberate inclusions, not token amenities.
Timeline: Handover Was June 2024
Construction began in January 2023. The expected handover was June 2024, a date now well behind us. This is not an off-plan opportunity with construction risk ahead. The building has likely cleared handover.
A buyer today is evaluating a finished or near-finished product, not a floor plan. That shifts what the due diligence looks like.
Getting In at 20%: The Original Payment Structure
| Phase | Percentage |
|---|---|
| Down payment | 20% |
| During construction | 50% |
| At handover | 30% |
The plan required 20% at signing, roughly AED 405,000, with 50% paid through the construction period and the remaining 30% at handover. No post-handover instalment component was included.
For buyers who purchased off-plan, most of the financial commitment moved during construction rather than being deferred. The full purchase price was settled at the point of receiving keys. For buyers entering now through resale, the original payment plan terms would not govern the transaction.