Park Greens Phase 2: Five-Bedroom Villas in Damac Hills 2
Park Greens Phase 2 is a villa community within Damac Hills 2, the large-scale master development that Damac Properties has built out in Dubai's southern suburbs. This is the second phase of the Park Greens sub-community. The product is straightforward: five-bedroom villas at a fixed price point, with construction underway and handover set for early 2027.
Living in Damac Hills 2
Damac Hills 2 sits in Dubailand, connected to central Dubai via Al Qudra Road. The drive to Downtown Dubai runs roughly 35 to 40 minutes in normal traffic; Business Bay and DIFC are similar distances. For buyers commuting daily to those hubs, the travel time is a real factor. For remote workers, frequent travellers, or families putting space and greenery first, the location calculus is different.
The community is self-contained in its essentials. Restaurants, retail, a mosque, and parks sit within the development. The surrounding area continues to grow, but Damac Hills 2's character is established: a low-density residential enclave.
A Single Villa at AED 2,880,000
The available unit is a 5-bedroom villa, Type TW-23, spanning 3,542 sq ft, priced at AED 2,880,000 (approximately AED 814 per sq ft). Phase 2 offers one layout only. There is no range to navigate or unit mix to compare.
A five-bedroom, 3,542 sq ft villa suits a large household or a family that wants meaningful indoor space and a garden footprint. The single-layout structure makes the purchase decision simple: whether this specific product at this price fits the buyer's needs.
What 12 Amenities Say About the Target Resident
| Category | Facilities |
|---|---|
| Outdoor and Recreation | Community Park, Landscaped Parks, Barbecue Area, Children's Play Area |
| Fitness and Wellness | Gymnasium, Well-being and Fitness, Shared Pool |
| Lifestyle Services | Restaurants, Retail Facilities, Valet Parking |
| Community Infrastructure | Mosque, CCTV Security |
Valet parking is unusual for a villa sub-community and signals a service-oriented approach to common area management.
The mix leans heavily outdoor: two parks, a barbecue area, a children's play zone, and a pool. The gymnasium and wellness facilities round out the indoor offering. The overall profile targets families who prioritise outdoor space and community infrastructure over hospitality-style amenities.
March 2027 Handover: 19 Months Out
Construction began in June 2024. The expected completion is March 2027, roughly 19 months from now. A buyer entering at this point is mid-construction, not at the early stages.
That shorter remaining timeline gives buyers a defined horizon for planning. End-users preparing to move have under two years before key collection. The off-plan period is measurable, not open-ended.
Getting In for 20%
| Payment Phase | Share | Amount (AED) |
|---|---|---|
| Down payment | 20% | 576,000 |
| During construction | 40% | 1,152,000 |
| Handover | 40% | 1,152,000 |
The 20% down payment of AED 576,000 is the entry point. The 40% construction-period tranche is spread across the remaining build phase through to early 2027. The 40% balance is due at handover.
There is no post-handover plan, so the full purchase price is settled by completion. For mortgage buyers, the handover tranche is the portion a bank loan covers at key collection. Cash buyers commit the full AED 1,152,000 at March 2027.








