Safa Two by Damac Properties: Two Towers in Business Bay, Handing Over April 2027
Safa Two is a residential development by Damac Properties in Business Bay, Dubai. The project delivers two towers of apartments: studios, one-bedrooms, two-bedrooms, and three-bedrooms. Construction started in September 2019. Handover targets April 2027, roughly ten months away.
The location, payment structure, and amenity set together define who this project suits.
Business Bay: What This Address Actually Delivers
Business Bay runs along the Dubai Canal, directly south of Downtown Dubai. The district combines corporate offices, hotels, and residential towers in a canal-side setting. The mix of uses creates a dense urban environment with short distances between work, retail, and residential functions.
Downtown Dubai is under 10 minutes by car. DIFC sits in the same direction. Dubai Mall is reachable within the same radius. The Business Bay metro station on the Red Line runs east toward Dubai International Airport and west toward the Marina. For a resident working in Dubai's commercial core, the commute from here is short.
The canal waterfront is part of what makes Business Bay distinct as a residential location. The pedestrian promenade along the canal provides walkable access to the water's edge and connects into the broader Downtown waterfront route. Residents have access to the canal for walking, cycling, and jogging year-round.
What AED 2.2 Million Gets You Here
Safa Two lists apartments at AED 2,207,000. The recorded minimum and maximum prices are the same figure, making this a single entry price rather than a range. Tower A and Tower B together offer studios, one-bedrooms, two-bedrooms, and three-bedrooms.
The bedroom mix covers different buyer profiles: from an investor looking for a compact unit to a family seeking a three-bedroom apartment in a central location. The AED 2.2 million price applies to a specific unit type within that mix.
A Seven-Facility Package Built for Daily Life
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Health Club |
| Leisure | Leisure Lounge, Shared Pool |
| Dining | Restaurants |
| Family | Children's Play Area |
| Services | Security |
Seven amenities is a practical package for a Business Bay tower. Two points stand out. First, the on-site restaurants: Business Bay draws residents with demanding work schedules, and in-building dining removes the need to go out on evenings when cooking is not an option. Second, the Health Club and Gymnasium are listed as separate facilities, not a single gym space. That adds capacity and gives residents two distinct fitness environments.
The Children's Play Area anchors the project in family-occupant territory as well as professional territory. The Leisure Lounge and Shared Pool complete a set built for regular use rather than showpiece marketing.
The overall amenity profile suits a resident who values function over spectacle. This is a practical urban tower, not a resort project. That fits Business Bay's character well.
Under a Year to Keys
Construction started in September 2019. Expected completion is April 2027, roughly ten months away. Seven years of active construction are behind this project. A buyer entering now joins the closing phase of a long build. The project's long build history means most of the construction phase is already done.
20% Down, 25% at Completion
| Stage | Amount Due |
|---|---|
| Down payment | 20% |
| During construction | 55% |
| On handover | 25% |
The plan starts with a 20% down payment: on a unit at AED 2,207,000, that is AED 441,400 up front. The 55% construction period installments follow over the remaining timeline. The final 25% falls due at handover in April 2027, equal to AED 551,750.
There is no post-handover installment option. The plan has a defined structure: 20% to enter, installments through construction, and full settlement at the April 2027 handover.










