Silver Springs Phase 3: Villas and Townhouses in Damac Hills
Silver Springs Phase 3 is the third residential cluster from Damac Properties within the Silver Springs sub-community of Damac Hills. The project delivers 3 to 6-bedroom townhouses and villas across one of Dubai's established master-plan communities. Construction started in May 2021. The target completion was January 2024, placing this project firmly in the completed category rather than an active off-plan opportunity.
Where Damac Hills Sits
Damac Hills occupies southwestern Dubai, roughly 25 kilometres from Downtown Dubai. Dubai International Airport is around 30 minutes by car via the Sheikh Mohammed Bin Zayed Road corridor. The district is a large master-planned golf community built around generous open space and low-density residential plots. That gives it a character distinct from the denser, higher-rise clusters closer to the coast.
Silver Springs sits within a quieter residential pocket of the broader master plan. For residents, the Mall of the Emirates and Dubai Marina are each within a 25 to 30-minute drive. The community includes its own retail and dining, which reduces dependence on external trips for daily needs. Buyers considering this location against more central Dubai options are weighing residential scale and greenery against shorter commutes and city density.
AED 3,499,888: What a Single Price Point Signals
The listed price is AED 3,499,888. Both the minimum and maximum are set at the same figure. In a project spanning 3 to 6-bedroom units across two property types, a single price point typically means one specific unit type or configuration is currently being listed, not that all units in the phase carry this price. Treat this as a reference point for the available listing rather than a floor or ceiling across the broader unit mix.
Townhouses and Villas: 3 to 6 Bedrooms
The project offers both property formats across a wide size range. Townhouses are available in 3, 4, 5, and 6-bedroom configurations. Villas cover the same bedroom range.
The 3-bedroom townhouse suits a smaller family or an investor targeting rental demand in a family-oriented suburban community. The 4 and 5-bedroom options are for growing families who want private outdoor space at a lower land commitment than a full villa. The 5 and 6-bedroom villas appeal to buyers who want the largest possible footprint in a completed, established residential cluster with no off-plan wait.
Amenities
| Category | Facilities |
|---|---|
| Fitness | Gymnasium |
| Dining | Restaurants |
| Recreation | Shared Pool, Children's Play Area |
| Services | Security |
Five facilities across four categories. On-site restaurants are a less typical feature in a low-density suburban villa and townhouse community. The wider package (gym, shared pool, children's play area, and security) confirms the target resident: a family with children planning to live here as a primary home rather than rotate it as a short-term rental.
Construction and Handover: January 2024
Construction began in May 2021. The registered target handover date was January 2024. That date is now more than two years in the past. Buyers entering now are purchasing into a completed or near-completed community, not taking on construction risk. The off-plan entry window with its associated pricing discount is no longer available.
The Payment Structure: 50% Down
| Stage | Percentage |
|---|---|
| Down payment | 50% |
| During construction | 40% |
| Handover | 10% |
The original payment structure required a 50% down payment at signing. That is a substantial upfront commitment. The 40% construction tranche and 10% handover payment followed as the build progressed. This structure reflects the 2021 launch terms. With the project past its January 2024 target date, those intermediate payments have already run their course for buyers who entered at launch. The plan above is the registered original structure.