Violet 4: Four-Bedroom Townhouses in Damac Hills 2 from AED 1.96 Million
Damac Properties launched Violet 4 in late 2024 as the fourth phase of the Violet cluster within Damac Hills 2. It offers 4-bedroom townhouses at a fixed price of AED 1,958,000, two layout options, and construction that started immediately after booking opened.
A Master Community Built Around Space
Damac Hills 2 sits in the Dubailand corridor, roughly 30 to 35 minutes from Downtown Dubai and Dubai International Airport in normal traffic. That drive time is the trade-off buyers accept in exchange for lower entry prices and more living space. The master community is built around parks, open land, and a low-density residential format that contrasts with the denser areas closer to the city centre.
Daily life requires a car. Sheikh Mohammed Bin Zayed Road (E311) is the main connection, linking residents to Dubai Silicon Oasis, Academic City, and the rest of the city. Al Maktoum International Airport is closer than DXB, which matters for frequent travellers or anyone working in the southern growth corridor.
What AED 1.96 Million Gets You
Both unit types are priced at AED 1,958,000. Type A covers 2,415 sq ft and Type B covers 2,352 sq ft. The size difference is small. Both are 4-bedroom townhouses, bringing the price-per-square-foot to roughly AED 810 to AED 833. For a 4BR unit in a master-planned community with this level of amenity, that is a competitive entry point in the Dubai off-plan market.
A single price covers both layouts. Buyers choose between a slightly larger and a slightly smaller floor plan, not between different product tiers.
Townhouses Only
Violet 4 is a single-format phase. Every unit is a 4-bedroom townhouse. No apartments, no studios. This suits a family wanting a private home with outdoor space, or an investor targeting the family rental pool in a community built for long-term residents.
What the Amenities Signal
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Indoor Swimming Pool |
| Outdoor | Landscaped Gardens, Children's Play Area |
| Dining | Restaurants |
| Security | CCTV Security |
Six amenities covering fitness, outdoor living, dining, and security. The indoor pool is the standout item: Dubai's summer heat limits outdoor pool use for several months of the year, and an indoor option keeps the facility practical year-round. The children's play area and landscaped gardens point clearly at families in residence rather than short-stay tenants. On-site restaurants reduce the daily need to drive out for meals, which matters in a location that is car-dependent.
Completion in August 2027
Construction started in December 2024, with handover expected in August 2027. That is 32 months from launch to keys. Buyers entering now in mid-2026 are approximately 18 months from completion. Construction is already underway, which reduces the execution risk typical of early off-plan entry.
Payment Structure: 20% Down, 40% at Handover
| Phase | Payment |
|---|---|
| Down payment | 20% |
| During construction | 40% |
| Handover | 40% |
The 20% down payment is the standard off-plan entry in Dubai. The 40% construction portion spreads across 32 months of build time. The significant cash event is the 40% due at handover: the largest single payment in the schedule. Buyers using a mortgage need financing arranged before that date. There is no post-handover installment option on this project.






