La Rosa Phase 5: Townhouse Living in Villanova, Dubai Land
La Rosa Phase 5 is a townhouse community developed by Dubai Properties within the Villanova master-plan in Dubai Land. It is the fifth sub-phase within La Rosa, a gated residential cluster inside the wider Villanova development. Construction started in September 2021, with an original expected completion of August 2024.
Dubai Land: What the Location Means
Dubai Land is a large residential district positioned between Al Barsha and the Dubai-Hatta corridor, with access to Emirates Road (E611). It is not a central location. The commute to Downtown Dubai or Business Bay runs 30 to 40 minutes in normal traffic. What Dubai Land offers in return is space, lower density, and a suburban character that central districts cannot replicate.
Villanova sits within Dubai Land as a gated master community. La Rosa is one of the residential clusters within it, and Phase 5 is the latest sub-development. Both Villanova and the earlier La Rosa phases were already underway before Phase 5 launched, meaning buyers entering this phase inherit an established community environment rather than a greenfield site. For end-users, the self-contained structure of a master community like Villanova reduces dependence on central city infrastructure for day-to-day life.
What AED 1.4M to 1.8M Buys Here
Two unit configurations are available:
- 3-bedroom townhouses at 1,949 to 1,993 sq ft, starting from AED 1,399,000
- 4-bedroom townhouses at 2,342 sq ft, starting from AED 1,799,000
The AED 400,000 spread between the floor and ceiling comes down to bedroom count and built area. At AED 1.4M, a buyer gets a three-bedroom home just under 2,000 square feet, at roughly AED 717 per square foot. At AED 1.8M, that steps up to a four-bedroom at over 2,300 square feet at around AED 768 per square foot, adding roughly 350 to 390 additional square feet. That difference matters most for families where an extra bedroom and more square footage changes what the home can practically do.
Townhouses Only
La Rosa Phase 5 is exclusively townhouses. No apartments or villas are in this phase.
The 3-bedroom units are the more accessible entry point: more space than a comparable apartment, a private outdoor area, and a price well below the four-bedroom tier. The 4-bedroom units suit families who need the additional bedroom and can absorb the premium. Both configurations come with individual outdoor space, which is a practical consideration for buyers with young children and a meaningful benefit over apartment living.
Community Facilities
| Category | Facility |
|---|---|
| Outdoor | Landscaped Parks, Children's Play Area |
| Fitness | Health Club, Gymnasium, Shared Pool |
| Dining | Restaurants |
The amenity mix is clearly aimed at families. Landscaped parks combined with a children's play area address outdoor activity across age groups. The fitness provision spans a health club, a gymnasium, and a shared pool. On-site restaurants give residents a dining option without leaving the development, which matters in a location that sits well outside central Dubai. The overall set points to a project targeting long-term residents rather than short-term investors.
Completion: August 2024
Construction began in September 2021. The expected completion date was August 2024, which has now passed by nearly two years. This project has most likely already been handed over.
Getting In for 10% Down
| Phase | Percentage |
|---|---|
| Down payment | 10% |
| During construction | 40% |
| Handover | 50% |
The 10% down payment is lower than what most Dubai off-plan projects require at entry. The structure places the largest obligation at the back end: 50% of the purchase price falls due at handover. The 40% during construction distributes across the build period. The structure concentrates the buyer's largest cash obligation at the exact moment of ownership transfer.








