City Walk Northline Phase 2: Meraas Continues Building the District It Created
City Walk Northline Phase 2 is a residential apartment project by Meraas Holding, located within the City Walk district in Dubai. This is the second Northline phase, sitting inside a neighbourhood that Meraas built and continues to manage. That integrated ownership shapes the living environment in ways a mixed-tenure district cannot replicate. The retail, the public spaces, and the residential buildings around you share the same master plan, and the developer has a direct stake in maintaining quality across all of it.
Inside the City Walk Address
City Walk is built around pedestrian activity. Open-air retail, restaurants, and public art streets run through the district. Residents here live alongside the commercial activity rather than driving to it. For Dubai, that is a genuinely different proposition.
The location puts you between Al Safa Park and the Jumeirah coast, with Al Wasl Road connecting directly to Sheikh Zayed Road and the broader city network. Business Bay is roughly 10 minutes by car. Downtown Dubai and DIFC are under 15 minutes. For someone working in either financial cluster, the commute is short and the route is direct.
Northline sits toward the northern end of the City Walk master plan, adjacent to Al Wasl Road. This is a calmer section than the retail core. If you are buying to live in the unit, the proximity to Al Wasl Road gives you practical access to the city while keeping some distance from the foot traffic of the commercial spine.
Apartments from 688 to 3,528 Square Feet
The project offers apartments across one-bedroom, two-bedroom, and three-bedroom configurations. The size range is wide and covers meaningfully different buyer profiles. One-bedrooms come in at 688 to 813 sq ft, compact but functional for a professional or couple. Two-bedrooms span 1,128 to 1,755 sq ft. Three-bedrooms run from 2,155 to 3,528 sq ft. The upper end of the three-bedroom range rivals townhouse footprints and places those units in a different segment entirely from the entry configurations.
The project has one published price at this stage: AED 1,870,000.
Amenities: Focused and Intentional
| Category | Facilities |
|---|---|
| Fitness & Leisure | Infinity Pool, Gymnasium |
| Community & Social | Barbecue Area, Children's Play Area |
| On-Site Convenience | Dining in building |
Five amenities is a lean set. In-building dining is the most specific item on the list. It means residents can eat on-site without heading out to the district's commercial strip, which matters if you are living there full-time. The gym and infinity pool address standard resident expectations. The barbecue area and children's play area together point toward families and owner-occupiers as the intended resident profile, rather than a building optimised for short-stay turnover.
July 2027: Two Years of Construction Remaining
Construction started in August 2024. The expected completion date is July 2027, giving a total build period of approximately three years. A buyer entering now has roughly two years ahead before handover. The project is in active construction and the timeline is defined, which makes it easier to plan around the delivery date.
Getting In at 20%
| Stage | Percentage |
|---|---|
| Down Payment | 20% |
| During Construction | 55% |
| At Handover | 25% |
The 20% down payment is at the standard Dubai off-plan entry threshold. The 55% construction phase installments are spread across the period running to July 2027. The final 25% falls due at handover, with no post-handover extension in this plan. That is the largest single outlay after the construction period ends, landing at the point of delivery.