Jadeel Phase 3 by Meraas: Apartments in Madinat Jumeirah Living
Meraas Holding's Jadeel Phase 3 is a residential apartment development within the Madinat Jumeirah Living master community in Umm Suqeim 3, Dubai. The project offers 1, 2, 3, and 4-bedroom apartments priced from AED 2,192,847 to AED 7,943,177. Being the third phase within this master community means the surrounding infrastructure is already established around this building.
What This Location Delivers Day to Day
Umm Suqeim 3 sits along Dubai's coastal belt, positioned between the Jumeirah residential area to the east and the Marina corridor to the west. The Madinat Jumeirah Living community is directly adjacent to the wider Madinat Jumeirah retail and leisure complex, including the Souk Madinat Jumeirah. The beach is a short drive away, and the Burj Al Arab sits roughly 2 kilometres from the site.
Sheikh Zayed Road is the main artery for daily commutes. Downtown Dubai is approximately 20 minutes east; Dubai Marina is a comparable drive in the other direction. The broader Madinat Jumeirah complex adds retail, dining, and leisure options immediately outside the community gates, which reduces daily dependency on driving elsewhere.
For investors, this location sits within an established Meraas master plan where the amenity infrastructure is integrated rather than promised.
What AED 2.19M to AED 7.94M Covers
The price range spans four distinct bedroom configurations, each suited to a different buyer profile.
1-bedroom apartments open at AED 2,192,847. Sizes range from roughly 744 sq ft on upper floors to just over 1,000 sq ft at ground level, with ground-floor layouts consistently larger across unit types. These suit investors and single occupiers looking for a foothold in a well-located master community.
2-bedroom units start at AED 3,253,902 and span approximately 1,100 to 1,900 sq ft depending on floor and configuration. The larger ground-floor 2-bed layouts reach above 1,800 sq ft. These work well for couples or small families who want meaningful living space at a mid-range entry price.
3-bedroom apartments start at AED 5,423,171, from roughly 1,840 to 2,097 sq ft across multiple layouts on floors 2 through 8. This is the clearest tier for families buying a primary residence, with enough space to accommodate day-to-day life comfortably.
4-bedroom units start at AED 7,943,177, with select layouts reaching 3,448 sq ft. These are the rarest configuration in this project, concentrated on the upper levels. They suit larger families or buyers seeking premium space within this community.
Amenities: A Family-Oriented Facilities Mix
| Category | Facilities |
|---|---|
| Fitness | Health Club, Gymnasium |
| Outdoor and Social | Community Park, Shared Pool |
| Family | Children's Pool, Children's Play Area |
| Dining | Restaurants |
The amenity set signals a community built around families and long-term residents rather than transient occupiers. A separate children's pool alongside the shared adult pool, a dedicated play area, and a community park all point toward outdoor communal living as a core element of how residents will use the space. The health club and gymnasium cover daily fitness on-site, and on-site restaurants reduce the need to leave the community for routine meals.
Timeline: Completion Was June 2025
Construction started in April 2024. The expected completion date was June 2025, which has now passed by over a year. This project is effectively at or past the handover stage, meaning buyers are looking at a ready or near-ready asset rather than an extended off-plan wait.
10% In, 50% at Handover
| Phase | Percentage |
|---|---|
| Down payment | 10% |
| During construction | 40% |
| At handover | 50% |
A 10% down payment sets a low entry requirement relative to the ticket prices across the range. The construction period accounts for 40%, spread across the build schedule.
The structure is significantly back-loaded: 50% is due at handover. Given the June 2025 completion date has already passed, this balance is an immediate consideration rather than a future one. There is no post-handover payment component, so the full purchase price settles at the point of delivery.





