Evergr1n House 3 by Object 1 in Jumeirah Garden City
Object 1 is building Evergr1n House 3 in Jumeirah Garden City, a district tucked between Al Satwa and the Jumeirah coastline in central Dubai. The project delivers apartments from studios to two-bedroom units, with construction underway since mid-2025 and handover set for March 2028.
A Central Address Between Two Dubai Corridors
Jumeirah Garden City sits between Sheikh Zayed Road and Jumeirah Beach Road. That puts it roughly ten minutes from Downtown Dubai and close to DIFC, Business Bay, and the Jumeirah coast. Al Satwa has historically been one of the more transit-accessible central districts in Dubai, with direct links to the city's main employment corridors.
For a professional commuting across Dubai, the location means shorter travel times without paying the premium of a Downtown or Marina address. For an investor, the central position and access to Sheikh Zayed Road keep rental demand broad.
What AED 1.09M to AED 2.46M Gets You
The price range spans AED 1,098,000 to AED 2,460,000. That spread reflects unit size and bedroom count, not different tiers of finish. Studios start at AED 1.098M for 448 sq ft. One-bedroom apartments begin at AED 1.99M at 819 sq ft. Two-bedroom units start at AED 2.46M for 1,065 sq ft.
The studio entry point puts this project in the mid-market band for new apartment buildings in central Dubai. At AED 2,460,000 for a two-bedroom, the top end stays well below the luxury threshold while giving buyers a meaningfully larger home in the same district.
Studios, One-Beds, and Two-Beds
All units are apartments. The studio is for a single buyer or a rental investor targeting young professionals who want a central Dubai address without large monthly outgoings. The one-bedroom suits a couple or a landlord looking for a tenant in the same demographic. The two-bedroom fits a small family or a buyer who needs home office space and still wants to stay within ten minutes of DIFC.
What the Amenity Set Tells You
| Category | Amenities |
|---|---|
| Wellness | Indoor Swimming Pool, Jacuzzi & Steam, Gymnasium |
| Family | Children's Pool, Children's Play Area |
| Outdoors | Landscaped Gardens, Barbecue Area |
| Community | Golf Club and Clubhouse, Lobby in Building |
The Golf Club and Clubhouse is the outlier here. Mid-market apartment projects in Dubai do not usually include this. Combined with the indoor pool, Jacuzzi, and a dedicated children's pool alongside a play area, the amenity set covers a wide range of resident profiles. This is a building where the communal offer is positioned above the standard gym-and-rooftop-pool package. The target resident is someone who will actually use the building's facilities rather than treat them as a checkbox.
Off-Plan Timeline: 21 Months to Handover
Construction broke ground in July 2025. Handover is targeted for March 2028, which is approximately 21 months from now. For an off-plan buyer entering today, the bulk of the construction period is still ahead.
The March 2028 completion window is relevant for investors planning around resale or rental activation timing. Buyers who purchase now are locking in the current price at an early-to-mid construction stage, with the project already in progress rather than pre-launch.