Peace Lagoons: Apartments in Dubai Land from AED 775K
Peace Lagoons is a residential apartment development by Peace Homes Group in Dubai Land Residence Complex. Construction began in October 2024, with handover scheduled for June 2027. That gives a buyer entering now roughly 23 months before completion.
Dubai Land Residence Complex: What the Location Means in Practice
Dubai Land Residence Complex sits inland, east of Al Ain Road. It is not close to Downtown or the Marina, but that distance is exactly why the pricing works. For a buyer focused on value per square foot, this corner of Dubai offers more space for less money than comparable units closer to the waterfront.
The area connects to Emirates Road (E311) and Al Ain Road (E66). Both arterials get you to Business Bay in around 30 to 35 minutes in moderate traffic. Dubai International Airport is roughly 25 minutes away. For a buyer whose daily route involves the airport or the eastern corridors, this location makes practical sense.
From AED 775K to AED 1.35M: Who Each Price Point Is For
The range from AED 774,681 to AED 1,351,516 covers studios through two-bedroom apartments. The spread is significant and the midpoint matters.
A studio at AED 774,681 gives you a 403 sq ft unit. This is the most accessible entry point in the project and suits a buyer who wants to minimize their initial capital commitment on an off-plan position.
One-bedroom units range from around 617 sq ft to 802 sq ft, starting at approximately AED 1.25M. The size range within the one-bedroom category is wider than typical, so layout selection matters here.
The two-bedroom tops out at AED 1,351,516. That is a competitive price for a family-sized apartment in a community setting with a full amenity package.
What the Building Offers
| Theme | Facilities |
|---|---|
| Fitness & Wellness | Gymnasium, Well-being and Fitness, Indoor Swimming Pool |
| Outdoor & Family | Landscaped Gardens, Children's Play Area |
| Convenience | Cafe and Restaurants, Security |
The indoor swimming pool stands out. An indoor pool provides year-round access in a climate where outdoor swimming becomes impractical for several months. The gym and dedicated well-being space together indicate a building targeting residents who treat fitness as a regular habit, not an occasional amenity. The cafe and restaurant on site adds daily convenience that matters if you are actually living there.
Getting In for 20%
| Payment Stage | Percentage |
|---|---|
| Down payment | 20% |
| During construction | 80% |
A 20% down payment on the minimum price means roughly AED 155,000 to secure the entry-level studio. On the two-bedroom, that rises to about AED 270,000. The remaining 80% is spread across construction-linked installments through to June 2027.
The structure is straightforward. All financial obligations clear at or before handover, with no trailing payments extending past the completion date.
June 2027 Handover
Construction started in October 2024. Expected completion is June 2027, which puts handover roughly 23 months from now. That is a mid-range off-plan timeline. Long enough for construction-linked payments to be distributed across regular intervals. Short enough that handover is a near-term commitment rather than a distant promise.
Buyers entering now lock in at the current price with just under two years of construction installments ahead. The payment schedule runs in parallel with construction progress toward the June 2027 date.








