Sunbliss Residence, Al Furjan
Sunbliss Residence is a residential apartment building in Al Furjan, Dubai, developed by Purvanchal Developers. The project offers 1, 2, and 3-bedroom apartments and is currently under construction, with handover targeted for December 2026.
Al Furjan: Practical Access in Dubai's Southwest
Al Furjan occupies the southwestern corridor of Dubai, positioned between Sheikh Zayed Road and Mohammed Bin Zayed Road. The Route 2020 Metro extension runs through the community at Al Furjan Metro Station, giving residents a direct rail link to Dubai Marina, Downtown Dubai, and Dubai International Airport.
Day-to-day, the area is quiet and low-rise. Ibn Battuta Mall is a short drive for retail and daily errands. Dubai Marina is roughly 15 minutes by car. Jebel Ali Free Zone sits just south along the motorway, making the district practical for professionals based in the zone. Expo City Dubai, developed along the Route 2020 corridor, is a nearby work and entertainment destination for residents who prefer a shorter commute.
For investors, the location draws a tenant base from Jebel Ali, Expo City, and the broader southwestern corridor. The metro station keeps the community accessible to renters who rely on public transit, supporting demand across all bedroom sizes. Al Furjan sits in Dubai's mid-market residential segment, offering accessibility and community infrastructure rather than a premium address. Sunbliss Residence is priced to match that positioning.
AED 1.98M: The Price on Record
The recorded price for Sunbliss Residence is AED 1,983,800 for both the minimum and maximum entries in the listing. This is a single confirmed price point rather than a spread across the full unit range. At roughly AED 2M in a metro-connected, mid-market community, buyers enter with a short remaining construction window and can expect occupancy or rental income within approximately seven months.
Three Bedroom Sizes, Multiple Floor Plans
The building offers 1-bedroom, 2-bedroom, and 3-bedroom apartments across three layout types: Type A, Type B, and Type C. The 2-bedroom and 3-bedroom sizes each span more than one configuration, giving buyers at those tiers a choice in how the space is arranged.
The 1-bedroom units suit single professionals or couples looking for a first purchase or an entry-level buy-to-let. The 2-bedroom apartments work for small families and investors targeting the mainstream rental market in Al Furjan. The 3-bedroom units serve families who want meaningful living space in a community setting without the higher costs and density of central Dubai.
Amenities and What They Say About the Project
| Category | Facilities |
|---|---|
| Fitness & Leisure | Indoor Swimming Pool, Gymnasium |
| Outdoor & Family | Landscaped Gardens, Children's Play Area |
| Dining | Restaurants |
| Safety | CCTV Security |
The indoor pool is the most practical feature here. It provides swimming access throughout the year, including Dubai's summer months when outdoor facilities become too hot for regular use. The gymnasium rounds out a complete on-site fitness option without requiring residents to hold an external membership.
Restaurant service within a residential building is a meaningful addition. It signals a project aimed at residents who value daily convenience rather than a purely functional apartment. Combined with landscaped gardens and a children's play area, the amenity profile points clearly toward families as the primary resident type rather than transient renters or young single professionals. Six facilities covering fitness, outdoor space, dining, and security is a well-calibrated count for this price segment.
Completion Targeted for December 2026
Construction on Sunbliss Residence began in October 2024. The expected handover date is 31 December 2026, approximately seven months from now.
For buyers entering at this stage, the off-plan window is short. Construction started close to 19 months ago, and the project is well into its build cycle. Investors should be positioned to list the unit for rent within a year of committing. Owner-occupiers face a defined wait with a known end date. The confirmed start date, active construction, and near-term completion give buyers a clear picture of what they are committing to.








