Taormina Village: Villas and Townhouses from Reportage in Majan
What the Project Is
Taormina Village is a gated residential development of townhouses and villas in Majan, Dubai, developed by Reportage Real Estate. Construction started in December 2024. Handover is targeted for December 2027.
What Majan Means Day to Day
Majan sits in Dubailand, with Motor City to the south and Academic City to the east. The main road connections are Emirates Road (E611) and Sheikh Mohammed Bin Zayed Road (E311). Downtown Dubai is roughly 30 minutes by car; Dubai International Airport is a comparable drive.
This is a car-dependent address. There is no walkable retail strip or metro access in the immediate area. The district is still building out, which means lighter traffic congestion today but an active construction backdrop on neighbouring plots over the near term.
The practical choice to live here is space and quiet over urban convenience. A family wanting a private garden, a dedicated driveway, and some distance from the city core will find Majan comfortable. Buyers who commute daily to the Marina or the DIFC will find the drive a real consideration.
Pricing: AED 3.4M to AED 3.6M
The range is narrow: AED 200,000 separates the floor from the ceiling. That spread points to pricing being unit-type driven rather than view or floor premium. Townhouses likely anchor near AED 3.4M; villas sit toward the top.
This is mid-market villa pricing for Dubailand. The ticket size and format target owner-occupying families and investors focused on the family rental segment in this corridor.
Townhouses and Villas
Two property formats are available: townhouses and villas. Both suit households that prioritize private outdoor space and multi-room living over a shared apartment building. Townhouses are the entry point for buyers who want the community feeling and a private garden without committing to the full villa price. Villas suit those who need more internal floor area, a larger plot, or want to house bigger families as tenants.
Ten Amenities Covering Fitness, Water, and Family Life
| Category | Facilities |
|---|---|
| Water | Infinity Pool, Shared Pool, Beach Access |
| Fitness | Health Club, Gymnasium, Well-being and Fitness |
| Outdoor | Landscaped Gardens, Cycle Track, Children's Play Area |
| Convenience | Retail Facilities |
Beach Access is the standout item on this list. Paired with an infinity pool and a shared pool, residents have three distinct water facilities available on-site. The fitness layer is equally generous: a health club, a gymnasium, and a dedicated wellness facility give active residents real choice without sharing a single crowded space.
The cycle track, children's play area, and landscaped gardens complete a family-oriented outdoor offer. On-site retail cuts down the need to drive out for everyday goods. Taken together, the amenity set suggests a developer expecting residents to spend most of their leisure time within the community rather than going out for it.
Eighteen Months to Handover
Construction started in December 2024. Expected completion is December 2027, leaving buyers entering now approximately 18 months of build time remaining.
For an off-plan buyer, that window means capital committed without rental income until late 2027. The purchase price is locked at today's off-plan rate. The build timeline itself is credible for a villa-format community of this scale.
Getting In on 30%
| Stage | Percentage |
|---|---|
| Down payment | 30% |
| During construction | 70% |
The 30% down payment translates to AED 1.02M to AED 1.08M due at signing depending on unit type. That is a material upfront commitment and narrows the practical buyer pool to those with strong liquidity or an existing asset to draw on.
The remaining 70% is spread across the construction period. All payments complete at or before handover, with no post-handover schedule. Buyers relying on a mortgage need finance pre-approval in place ahead of the final construction milestone payments.









