Guzel Tower by Tiger Group: Apartments in Jumeirah Village Triangle
Tiger Group is developing Guzel Tower in Jumeirah Village Triangle (JVT), District 1, a residential community in the western-central zone of new Dubai. JVT sits between Jumeirah Village Circle to the south and Al Barsha to the east, with direct access to Sheikh Mohammed Bin Zayed Road and Al Khail Road. Dubai Marina is roughly 15 minutes by car, Expo City around 10 minutes, and Downtown Dubai about 25 to 30 minutes.
That road network covers multiple employment corridors. The Media City, Internet City, and JLT cluster lie to the west. Business Bay and DIFC are reachable eastbound on Al Khail. Expo and Al Maktoum Airport are to the south. For a professional working across two or three parts of Dubai, JVT offers central positioning without being anchored to a single hub.
What AED 794K to AED 1.18M Gets You
Prices run from AED 794,148 to AED 1,177,953. The development covers studios, one-bedroom, and two-bedroom apartments across two blocks, and the spread tracks the unit mix directly. Studios anchor the lower end; two-bedroom apartments push toward the ceiling.
A buyer at the lower end is most likely an investor targeting rental yield from a compact studio. At the upper end, the profile shifts toward owner-occupiers who want a two-bedroom apartment in a managed building, or investors with a larger capital allocation. The price band sits in JVT's mid-market range.
Studios, One-Bedrooms, and Two-Bedrooms Across Two Blocks
Guzel Tower consists of Block A and Block B, both offering studios, one-bedroom, and two-bedroom apartments. Layout types appear mirrored across the two blocks, suggesting a symmetrical design.
Studio sizes span from around 350 sq ft to just over 1,000 sq ft. One-bedroom layouts are approximately 678 to 753 sq ft. Two-bedroom apartments come in at around 1,071 sq ft. The larger studios at 1,000+ sq ft are an unusual bracket: at that size, they function closer to a junior one-bedroom than a conventional studio, which changes both the pricing expectation and the renter profile.
Facilities
| Category | Amenities |
|---|---|
| Wellness | Indoor Swimming Pool, Jacuzzi & Steam, Gymnasium |
| Outdoor | Landscaped Gardens, Barbecue Area |
| Family | Children's Play Area |
| Building | Security |
The indoor pool, jacuzzi, and steam room combination stands out in this set. An indoor pool is usable through all seasons, including Dubai's peak summer months. Pairing it with jacuzzi and steam points to a focus on post-exercise recovery, not just baseline fitness provision. The children's play area and barbecue space confirm the project targets families and residents who value communal outdoor space.
December 2027 Completion
Construction began in December 2024. Expected completion is December 2027, a three-year build window from start to handover.
For an off-plan buyer entering now, handover is three years away. That suits investors who want the construction cycle to run its course before they take on rental management, and owner-occupiers who need time to arrange financing or consolidate other assets.
Getting In for 20%
| Milestone | Payment |
|---|---|
| Down payment | 20% |
| During construction | 50% |
| Handover | 10% |
| Post-handover | 20% |
The 20% down payment is the entry point. The more notable feature is the post-handover tranche of 20%: one-fifth of the purchase price falls due after keys are in hand. At the minimum unit price of AED 794,148, that comes to roughly AED 158,830 owed after handover.
For investors, rental income from the unit runs alongside those post-handover payments, though timing depends on occupancy speed. For owner-occupiers, the deferred 20% provides flexibility around the handover date, particularly when arranging a mortgage. The 50% owed during construction is the largest single tranche, spreading the bulk of the cost over the three-year build period.








