Al Thowima Residences: Apartments in Al Barsha 1
Al Thowima Residences is a residential project by Wasl Properties in Al Barsha 1, Dubai. The building offers one-, two-, and three-bedroom apartments. Construction started in October 2023, with completion originally scheduled for December 2023. That date is now more than two years in the past, which means buyers approaching this project today are most likely looking at a completed property rather than a development still under construction.
Al Barsha 1: What the Location Delivers
Al Barsha 1 sits between Sheikh Zayed Road and Al Khail Road. The Mall of the Emirates is in the district. A Metro station on the Red Line serves the area, and the journey to Downtown Dubai takes around 20 minutes by rail, while Dubai Marina is closer at roughly 10 minutes. That puts two of Dubai's main employment and lifestyle hubs within easy reach without a car.
The neighbourhood is well-established. Supermarkets, clinics, schools, and a dense concentration of restaurants are close by on foot or a short drive. Residents do not need to leave Al Barsha 1 for most daily needs. The district connects well in all directions, making it a workable base for people employed in different parts of the city.
One, Two, and Three Bedrooms
The project offers apartments in three configurations: one-bedroom, two-bedroom, and three-bedroom layouts, all listed as Type A.
The one-bedroom is an entry point for a professional or a couple who wants Metro access and proximity to the Mall without carrying more space than they need. The two-bedroom works for couples, young families, and sharers who value the extra room. The three-bedroom suits a family looking for space within a central location, as an alternative to the villa communities further out.
What the Amenities Say
| Category | Amenities |
|---|---|
| Outdoor / Green Space | Landscaped Parks, Children's Play Area |
| Fitness | Gymnasium |
| Water | Shared Pool |
| Convenience | Covered Parking, Restaurants |
Six amenities is a functional rather than resort offering for a mid-market apartment building. The pool, gym, and parks cover what most residents in this part of Dubai would consider standard. The children's play area is a deliberate inclusion: it signals that the building is positioned for families alongside single-occupant households. On-site restaurants are less common at this segment and add a daily convenience that matters to working residents.
The amenity set points to a project aimed at practical residents rather than buyers chasing a lifestyle brand.
Handover Timeline
Construction at Al Thowima started in October 2023. Completion was scheduled for December 2023, a date now well in the past. The project has in all likelihood already been handed over. A buyer today is entering a completed building, which removes construction-stage risk from the picture.
Getting In for 10%
| Payment Stage | Amount Due |
|---|---|
| Down payment | 10% |
| During construction | 30% |
| Handover | 60% |
The entry point is a 10% down payment. That is a low initial outlay before construction payments begin. The structure then asks for 30% during construction, with the remaining 60% due at handover. There are no post-handover installments.
The handover payment is the significant financial event in this structure. A cash buyer needs that 60% liquid and accessible on transfer day. A buyer using a mortgage needs the loan approved and drawn before the keys change hands. The plan itself has no complex milestones: three stages, fixed percentages, no ambiguity.


