One B Tower: Getting Into Business Bay for 5%
One B Tower is a residential development by Wasl Properties in Business Bay, Dubai. Construction began in March 2025, with handover scheduled for December 2028. The project offers apartments and duplexes, ranging from one-bedroom units to four-bedroom duplexes.
The entry cost stands out. At 5% down, the initial capital requirement is modest. On a purchase near the project minimum of AED 2,556,000, that translates to roughly AED 128,000 to secure a contract. The construction-period portion accounts for 35%, spread across the build. The remaining 60% falls due at handover.
What the AED 2.5M to AED 15.5M Range Covers
The spread from AED 2,556,000 to AED 15,560,000 is wide. It reflects a project that places multiple product types under one roof rather than targeting a single buyer segment.
Apartments run from one to four bedrooms. Smaller units provide the lower entry point, suited to buyers who want a central Business Bay address without stretching to larger formats. Four-bedroom apartments at around 3,970 square feet sit at the top of the apartment range.
Duplexes are a distinct offer. They provide split-level layouts and more floor area than a standard apartment at the same bedroom count. Two-bedroom duplexes reach around 2,192 square feet. Four-bedroom duplexes top out above 4,700 square feet and carry the maximum price in this project.
A buyer at the low end wants a foothold in Business Bay for personal use or rental income. A buyer at the top end is choosing on floor area and layout, taking a duplex for the volume it delivers rather than for any pricing advantage.
Business Bay: Location and What It Means
Business Bay runs along the Dubai Canal and borders Downtown Dubai to the north. The Business Bay Metro station is within the district. DIFC sits close to the west. Sheikh Zayed Road flanks the area and gives direct access to the broader commercial corridor.
The district mixes commercial towers, hotels, and residential buildings on the same blocks. That concentration creates a steady tenant profile from the professional and commercial sector. For owner-occupiers, the density is the trade-off for the connectivity.
What the Amenity Set Signals
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Indoor Swimming Pool |
| Outdoor | Landscaped Gardens |
| Family | Children's Play Area |
| Convenience | Retail Facilities |
| Security | CCTV Security |
The indoor pool is the most practical item here. An indoor facility avoids the seasonal constraints that limit outdoor pool use in Dubai's climate, making it genuinely usable year-round. The combination of gym, landscaped gardens, children's play area, and on-site retail points to a project targeting resident families and long-stay tenants. This is not a short-term rental amenity package.
Three Years to Handover
Construction started in March 2025. The expected handover date is 31 December 2028. A buyer entering in late 2026 is approximately 18 months into a 46-month build, with around 27 months remaining until possession.
For an off-plan buyer, this means the project is past its initial phase, with over two years of build time still ahead.
Getting In for 5%
| Stage | Percentage |
|---|---|
| Down payment | 5% |
| During construction | 35% |
| At handover | 60% |
The 5% entry is the competitive element of this payment plan. It keeps the initial commitment small while the buyer's position is secured. The 35% construction-period share spreads across roughly three years in staged installments. The 60% at handover is the structural weight of the plan. It arrives as a single lump sum at keys exchange.














