Tonino Lamborghini Phase 3 in Meydan: Apartments From One to Four Bedrooms
Gulf Land Property Developers is delivering the third phase of Tonino Lamborghini Residences in Meydan, Dubai. The project offers apartments across four bedroom counts, with the smallest at 831 sq ft and the largest at 2,491 sq ft. The branded name gives this development a recognisable identity within the Meydan masterplan, targeting buyers who want a lifestyle address without moving into the city's most expensive corridors.
Meydan: Road Access and Breathing Room
Meydan sits east of Downtown Dubai and south of Nad Al Sheba. The Meydan Racecourse is the district's most visible landmark, but the location's practical value comes from its road connections. Mohammed Bin Zayed Road and Al Khail Road are both reachable within minutes, putting Downtown Dubai roughly 15 minutes away and Dubai International Airport under 20 minutes in normal traffic.
The community sits within a broader masterplan that carries more open space between buildings than denser parts of the city. For buyers who want access to central Dubai without paying for a central Dubai postcode, Meydan sits in a practical position on that trade-off.
Four Apartment Layouts
The project spans the full apartment range:
- One-bedroom, 831 sq ft (Type A): the entry configuration, suitable for a professional or couple looking for a branded address at a compact footprint
- Two-bedroom, 1,303 sq ft (Type B): the mid-range pick, with a clear separation between living and sleeping areas
- Three-bedroom, 1,511 sq ft (Type A): meaningful family space without stretching to larger unit costs
- Four-bedroom, 2,491 sq ft (Type A): the project's largest option; over 2,400 sq ft gives buyers real room to use
Starting at AED 1,500,000
The listed price is AED 1,500,000, and both the minimum and maximum figures sit at that same number. This is a starting point, not a spread. The project offers units from 831 to 2,491 sq ft across four bedroom counts, so the actual price for two, three, and four-bedroom units will run above this floor. At 831 sq ft for the one-bedroom, AED 1.5M works out to roughly AED 1,805 per sq ft as a reference for the entry tier.
Handover in Six Months
Construction began in September 2025. Expected completion is December 2026, approximately six months from now. The project is already well into its build phase, around ten months through the construction timeline. Buyers who commit today are entering an off-plan project with a short remaining wait before handover.
Getting In for 20%
| Phase | Share |
|---|---|
| Down payment | 20% |
| During construction | 50% |
| Handover | 30% |
The 20% down payment means AED 300,000 on a 1.5M unit. The remaining 50% is distributed across the construction period through December 2026. The final 30% falls at handover in December 2026. The payment structure ends at handover; no post-handover installments apply.
Seven Amenities, One That Stands Out
| Category | Amenities |
|---|---|
| Recreation | Indoor Swimming Pool, Children's Pool, Landscaped Gardens |
| Lifestyle | Smart home |
| Building essentials | Lobby in Building, Covered Parking, Security |
Seven amenities is a modest count for a branded development. The indoor swimming pool is the notable inclusion. An indoor pool is usable year-round in Dubai's climate, whereas outdoor pools become impractical in the summer months. Paired with a children's pool, the recreational offer clearly targets families with young children. The smart home technology at the unit level adds a functional dimension above standard fittings. The remaining three, lobby, parking, and security, are baseline expectations at this price point. The amenity set does not compete on volume; the brand and location carry more weight here than the facilities list.


