Red Square Tower, JVT: Two Towers, One Mid-Market Case
Tiger Properties is delivering a twin-tower apartment project in District 3, Jumeirah Village Triangle. Red Square Tower offers 1-bedroom and 2-bedroom units across Tower A and Tower B. Construction started in June 2025, with handover targeted for April 2027.
Living in Jumeirah Village Triangle
Jumeirah Village Triangle sits between Al Khail Road and Mohammed Bin Zayed Road, two of Dubai's main arterial routes. Dubai Marina is roughly 15 minutes by car. Downtown Dubai is around 25 minutes. JVT does not have metro access, so residents rely on private transport or taxis for commuting. The district has its own retail, dining, and services within the community, which keeps day-to-day errands manageable without driving into the city.
The price range here, AED 1.1M to AED 1.76M for apartments, positions Red Square Tower in JVT's mid-market segment.
What AED 1.1M to AED 1.76M Buys
The spread between AED 1,125,127 and AED 1,756,852 reflects the two-tower structure rather than a wide product range. Tower B carries a consistent premium over Tower A for equivalent bedroom counts.
In Tower A, 1-bedroom apartments start at AED 1,082,313 for 651 sq ft. The equivalent 1-bed in Tower B opens at AED 1,239,533 for a similar footprint, a premium of roughly AED 157,000. That is a meaningful gap on a sub-AED 1.5M budget.
Two-bedroom units run from AED 1,502,902 in Tower A (913 sq ft) to AED 1,756,852 in Tower B (922 sq ft). The floor area across both towers is nearly identical for 2-beds, so the price premium for Tower B is not driven by size.
1-Beds and 2-Beds Across Two Towers
All units are apartments. Tower A's 1-bedroom range spans 651 sq ft to 917 sq ft, a considerable size spread within a single bedroom count. Starting prices across these sizes are nearly flat, which means buyers at the entry price can choose significantly more floor area simply by selecting the right layout.
The 2-bedroom units sit between 913 and 923 sq ft in both towers, compact but practical for couples or small households that prioritise location and amenities over floor area.
Amenities Built Around Active Living
| Category | Facilities |
|---|---|
| Fitness | Gymnasium, Yoga room, Well-being and Fitness, Cycle track |
| Recreation | Tennis Courts, Shared Pool, Shared Spa, Barbecue Area |
| Community | Landscaped Parks, Children's Play Area, Cafe and Restaurants |
Eleven amenities for a twin-tower project is a solid count. The fitness provision stands out: a gym, yoga room, cycle track, and a dedicated wellness space together signal a development aimed at health-conscious buyers. The shared spa is a notable addition to the amenity list.
The children's play area and landscaped parks indicate Tiger Properties is targeting families alongside investors. The cafe and restaurants listing means residents have on-site food and beverage options without leaving the building.
April 2027: Deep into the Build
Construction started in June 2025. Handover is targeted for April 2027, a 22-month build schedule. As of mid-2026, the project is roughly 14 months into construction with around 8 months remaining. Buyers entering now are stepping into the late-build phase of an off-plan purchase.
Getting In for 20%
| Phase | Percentage |
|---|---|
| Down payment | 20% |
| During construction | 60% |
| On handover | 20% |
The 20/60/20 plan is standard for Dubai off-plan. The 20% down payment is the entry cost. The significant obligation is the 60% during-construction tranche, paid in stages from contract through to April 2027. The remaining 20% lands at handover, with the full price settled by the time keys are exchanged.
On a 1-bed entry price of AED 1,125,127, the down payment works out to approximately AED 225,000. On a 2-bed in Tower A at AED 1,502,902, it rises to around AED 300,600.






