Haven Phase 2 By Aldar: Apartments in Dubai Land With a 2027 Delivery
Aldar Properties PJSC brings its second phase of the Haven community to Dubai Land. Haven Phase 2 follows the same community blueprint as Phase 1, with apartment living across a landscaped residential setting.
Dubai Land: What the Address Actually Means
Dubai Land sits in the interior of Dubai, south of Al Barsha and roughly 25 kilometres from Downtown. The location trades proximity to the coast or central business district for more space and lower land costs. That trade-off generally shows up in apartment sizes and community scale.
For an investor, the area suits families and professionals who prioritise community amenities and space over a central address.
For a commuter, expect 25 to 35 minutes to Business Bay and around 30 minutes to Dubai Marina, depending on traffic. The Emirates Road and Al Qudra Road are the main arteries. Public transport coverage in this part of Dubai Land is limited, so a car is practical.
The Haven By Aldar master community is the immediate context. Phase 2 sits within that established development, which means infrastructure, landscaping, and shared amenities are already in progress from Phase 1.
Apartments Across Multiple Configurations
The project offers apartments, with units ranging from studios through to three-bedroom layouts. The studio units start from around 489 sq ft, one-bedroom apartments run from 785 sq ft, two-bedroom units span 1,085 to 1,266 sq ft, and the three-bedroom option sits at 2,128 sq ft.
Studios and one-bedroom apartments are the natural entry point for investors looking to rent. Two- and three-bedroom units target families or buyers seeking more living space within the community context. The range from studio to three-bedroom under a single developer means this is a community play, not a boutique building.
What the Amenity Set Tells You
| Theme | Amenities |
|---|---|
| Fitness & Leisure | Indoor Swimming Pool, Gymnasium |
| Outdoor & Green Space | Landscaped Gardens |
| Family | Children's Play Area |
| Dining | Restaurants |
| Safety | CCTV Security |
The indoor swimming pool is worth a mention because outdoor pools are the norm in Dubai. An indoor facility means year-round use through the summer months without heat exposure. The presence of on-site restaurants within the community reduces the daily need to drive out, which matters when the nearest retail strip may not be immediately adjacent.
The amenity profile here is oriented toward residential comfort rather than high-end lifestyle. A gymnasium, pool, green space, and a children's play area cover the day-to-day needs of a family or young professional. This is a community for people who plan to live here, not a hotel-style project aimed at short-term yields.
The Build Schedule and What It Means to Enter Now
Construction began in May 2024. The project carries an expected completion of September 2027. That puts this approximately three years and two months from the construction start date, which is a standard timeline for a community-scale apartment development.
For an off-plan buyer entering now, the project is past its first anniversary of construction. That removes some of the early-stage risk where a project might stall before breaking ground. With an established Phase 1 alongside it, the community context is already taking shape.
Completion in September 2027 means a buyer purchasing today is looking at a roughly 14-month window before handover. For investors, a shorter wait means rental income starts sooner. For end-users, the move-in timeline is clearer to plan around.

