Projects in Emaar Beachfront

    Photo of Address Residences The Bay by Emaar Properties
    Dubai · Emaar Beachfront

    Address Residences The Bay

    EEmaar Properties
    TypeApartment / Penthouse / Townhouse
    CompletionQ4 2026
    Payment10/70/20
    Starting

    AED 2.9M

    Details
    Photo of Beach Mansion by Emaar Properties
    Dubai · Emaar Beachfront

    Beach Mansion

    EEmaar Properties
    TypeApartment / Penthouse / Townhouse
    CompletionReady
    Payment12/58/10/20
    Starting

    AED 5.8M

    Details
    Photo of Seapoint by Emaar Properties
    Dubai · Emaar Beachfront

    Seapoint

    EEmaar Properties
    TypeApartment / Penthouse
    CompletionQ1 2028
    Payment10/80/10
    Starting

    AED 3.5M

    Details
    Photo of Palace Beach Residence by Emaar Properties
    Dubai · Emaar Beachfront

    Palace Beach Residence

    EEmaar Properties
    TypeApartment
    CompletionReady
    Payment10/55/5/30
    Starting

    AED 2.4M

    Details
    Photo of The Bristol by Emaar Properties
    Dubai · Emaar Beachfront

    The Bristol

    EEmaar Properties
    TypeApartment / Penthouse
    CompletionQ3 2029
    Payment10/70/20
    Starting

    AED 3.7M

    Details
    Photo of Address The Bay by Emaar Properties
    Dubai · EMAAR Beachfront

    Address The Bay

    EEmaar Properties
    TypeApartment / Penthouse / Townhouse
    CompletionQ4 2026
    Payment10/70/20
    Starting

    AED 2.8M

    Details
    Photo of Beach Isle by Emaar Properties
    Dubai · EMAAR Beachfront

    Beach Isle

    EEmaar Properties
    TypeApartment / Villa
    CompletionReady
    Payment12/58/10/20
    Starting

    AED 2.9M

    Details
    Photo of Bayview By Emaar by Emaar Properties
    Dubai · EMAAR Beachfront

    Bayview By Emaar

    EEmaar Properties
    TypeApartment / Penthouse
    CompletionQ3 2028
    Payment10/80/10
    Starting

    AED 5.6M

    Details
    Photo of Grand Bleu Tower by Emaar Properties
    Dubai · EMAAR Beachfront

    Grand Bleu Tower

    EEmaar Properties
    TypeApartment
    CompletionReady
    Payment12/58/10/20
    Starting

    AED 2M

    Details
    Photo of Emaar Beachgate by Emaar Properties
    Dubai · EMAAR Beachfront

    Emaar Beachgate

    EEmaar Properties
    TypeApartment / Penthouse
    CompletionQ4 2026
    Payment10/70/20
    Starting

    AED 3.1M

    Details
    Area guide

    Where the Marina Meets Open Sea: New Projects in Emaar Beachfront

    Emaar Beachfront is a gated residential island within Dubai Harbour, built by Emaar Properties as a single master-planned zone. It occupies a man-made peninsula between Dubai Marina and Palm Jumeirah, giving residents direct beach access independent of shared public infrastructure. With 11 projects covering a genuine mix of residential types, the subdistrict offers meaningful choice within a tightly unified development brief.

    The individual projects within the community, including Address Residences The Bay, Address The Bay, Bayview, Beach Isle, Beach Mansion, Beachgate by Address, Grand Bleu Tower 1, Marina Vista, Palace Beach Residence, Seapoint, and The Bristol, each represent a distinct building or cluster under the same master plan.

    Where AED 2.9M Sits in the Range

    The median asking price is AED 2,900,000. Entry starts at AED 1,968,888 and the top of the range reaches AED 33,999,888. That spread is wide, and it maps directly to the property mix: the lower end reflects standard apartment inventory, while the upper tier captures larger penthouses and the single villa listing.

    Property Type Projects Available
    Apartment 11
    Penthouse 7
    Townhouse 3
    Villa 1

    Apartments are the core inventory type, present across all 11 projects. Penthouses appear in 7 of them, which is a high proportion for a subdistrict at this scale and points to demand for larger floor plates with water-facing exposures. Townhouses number 3 and the villa stands at 1, so horizontal living options are limited. Buyers targeting that format will find narrow choice within Emaar Beachfront and may need to look at adjacent communities.

    Delivery Timeline and What It Means Now

    The earliest completion in the pipeline dates to March 2023. Those projects have likely already handed over, and buyers should verify current availability and handover status directly with registered agents. The far end of the off-plan window runs to September 2029, giving buyers entering today a delivery horizon of up to three and a half years for the latest-stage projects.

    The minimum down payment across listed projects is 10%, a low entry point relative to many Dubai off-plan offerings. 5 of the 11 projects include post-handover payment plans, spreading remaining instalments beyond the handover date and reducing the capital required during construction. For buyers managing cash flow carefully, that structure can make a meaningful difference.

    Resident Profile the Amenities Suggest

    Children's play areas, a dedicated children's pool, shared pools, and a gymnasium appear prominently across the amenity list. The pattern points to a community built with families as the primary resident base rather than short-stay investors. Security features alongside balconies and barbecue areas, consistent with the gated island format and the outdoor-facing waterfront setting. This is not a high-density urban node; the entire layout favours residents who value beach proximity and residential calm over city-centre density.